IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

410

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0305 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,030 $500 Implemented
AM0305 # 02 Y:1997 02 1997 OPTIMIZE PLANT POWER FACTOR $9,350 $9,045 Implemented
AM0305 # 01 Y:1997 01 1997 REDESIGN PROCESS $101,500 $110,000 Not Implemented
AM0304 # 09 Y:1997 09 1997 DISCONNECT BALLASTS $110 $10 Implemented
AM0304 # 08 Y:1997 08 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $115 $0 Implemented
AM0304 # 07 Y:1997 07 1997 REPAIR AND ELIMINATE STEAM LEAKS $190 $65 Implemented
AM0304 # 06 Y:1997 06 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $220 $30 Not Implemented
AM0304 # 05 Y:1997 05 1997 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $750 $0 Implemented
AM0304 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $940 $975 Implemented
AM0304 # 03 Y:1997 03 1997 METER WASTE WATER $960 $3,500 Not Implemented
AM0304 # 02 Y:1997 02 1997 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $10,480 $12,500 Not Implemented
AM0304 # 01 Y:1997 01 1997 REDUCE SCRAP PRODUCTION $13,950 $3,000 Implemented
KG0096 # 06 Y:1997 06 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,228 $0 n/a
KG0096 # 05 Y:1997 05 1997 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $2,250 $500 n/a
KG0096 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $141 $300 n/a
KG0096 # 03 Y:1997 03 1997 MODERATE COOLING TOWER OUTLET TEMPERATURE $660 $60 n/a
KG0096 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,179 $425 n/a
KG0096 # 01 Y:1997 01 1997 INSTALL TIMERS AND/OR THERMOSTATS $1,652 $150 n/a
KG0095 # 06 Y:1997 06 1997 MODERATE COOLING TOWER OUTLET TEMPERATURE $870 $60 n/a
KG0095 # 01 Y:1997 01 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $5,748 $0 n/a
KG0095 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,204 $1,620 n/a
KG0095 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $2,094 $519 n/a
KG0095 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,444 $4,133 n/a
KG0095 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,325 $150 n/a
KG0095 # 07 Y:1997 07 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $178 $352 n/a