IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
NAICS 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0136 # 04 Y:2018 04 2018 INSTALL SPECTRAL REFLECTORS / DELAMP $5,731 $1,000 Not Implemented
UU0136 # 03 Y:2018 03 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,124 $0 Not Implemented
UU0136 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,936 $17,716 Implemented
UU0136 # 01 Y:2018 01 2018 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $159,197 $1,737,000 Not Implemented
UU0129 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,622 $0 Implemented
UU0129 # 02 Y:2018 02 2018 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $9,283 $120 Implemented
UU0129 # 03 Y:2018 03 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,783 $500 Implemented
UU0129 # 04 Y:2018 04 2018 SELL USED PLATES TO AN ALUMINUM RECYCLER $5,775 $0 Implemented
UU0129 # 05 Y:2018 05 2018 KEEP EQUIPMENT CLEAN $942 $80 Implemented
UU0106 # 06 Y:2006 06 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $590 $500 Not Implemented
UU0106 # 05 Y:2006 05 2006 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $23,010 $7,390 Not Implemented
UU0106 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,120 $4,000 Not Implemented
UU0106 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,510 $3,780 Not Implemented
UU0106 # 02 Y:2006 02 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $43,630 $20,000 Not Implemented
UU0106 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $19,900 $40,020 Not Implemented
UU0086 # 01 Y:2005 01 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,056 $12,620 Not Implemented
UU0086 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $15,260 $14,000 Not Implemented
UU0086 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $773 $4,320 Not Implemented
UU0086 # 04 Y:2005 04 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,447 $21,000 Not Implemented
UU0086 # 03 Y:2005 03 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $17,445 $3,600 Not Implemented
UU0086 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,984 $6,400 Not Implemented