Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
108
matching recommendationsNAICS | 339 | Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0205 # 06 Y:2022 | 06 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,070 | $150 | Not Implemented |
UU0204 # 04 Y:2022 | 04 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,347 | $5,215 | Not Implemented |
UU0204 # 02 Y:2022 | 02 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,275 | $12,600 | Not Implemented |
UU0204 # 03 Y:2022 | 03 | 2022 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $10,674 | $25,650 | Not Implemented |
UU0204 # 01 Y:2022 | 01 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $45,240 | $17,600 | Not Implemented |
UU0204 # 10 Y:2022 | 10 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $825 | $900 | Not Implemented |
UU0204 # 05 Y:2022 | 05 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $4,414 | $1,000 | Not Implemented |
UU0204 # 06 Y:2022 | 06 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,228 | $2,448 | Not Implemented |
UU0204 # 07 Y:2022 | 07 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,552 | $4,497 | Not Implemented |
UU0204 # 08 Y:2022 | 08 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,260 | $3,781 | Not Implemented |
UU0204 # 09 Y:2022 | 09 | 2022 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,637 | $1,536 | Not Implemented |
UU0201 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $771 | $1,550 | Not Implemented |
UU0201 # 06 Y:2022 | 06 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $307 | $329 | Not Implemented |
UU0201 # 05 Y:2022 | 05 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $730 | $500 | Implemented |
UU0201 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,786 | $1,000 | Implemented |
UU0201 # 02 Y:2022 | 02 | 2022 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $14,352 | $8,000 | Implemented |
UU0201 # 01 Y:2022 | 01 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $19,186 | $1,125 | Implemented |
UU0199 # 01 Y:2022 | 01 | 2022 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $9,239 | $4,868 | Implemented |
UU0199 # 02 Y:2022 | 02 | 2022 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $6,969 | $37,350 | Not Implemented |
UU0199 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,884 | $378 | Not Implemented |
UU0199 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,264 | $2,575 | Implemented |
UU0199 # 05 Y:2022 | 05 | 2022 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $200 | $564 | Not Implemented |
UU0167 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,178 | $17,274 | Implemented |
UU0167 # 04 Y:2020 | 04 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $12,331 | $22,500 | Not Implemented |
UU0167 # 03 Y:2020 | 03 | 2020 | CHANGE METHOD OF DEIONIZED WATER PRODUCTION | $35,350 | $180,000 | Implemented |