Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0047 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,693 $0 Not Implemented
UU0047 # 07 Y:2003 07 2003 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $4,941 $765 Not Implemented
UU0047 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $301 $150 Implemented
UU0047 # 05 Y:2003 05 2003 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $3,430 $7,126 Not Implemented
UU0047 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,044 $9,000 Implemented
UU0047 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,536 $4,800 Not Implemented
UU0047 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,212 $710 Implemented
UU0028 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,450 $700 Implemented
UU0028 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $844 $406 Implemented
UU0028 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,400 $2,000 Implemented
UU0028 # 07 Y:2002 07 2002 INSTALL SKYLIGHTS $17,689 $2,800 Not Implemented
UU0028 # 08 Y:2002 08 2002 $147,880 $100,000 Not Implemented
UU0028 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $5,590 $9,800 Implemented
UU0028 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $986 $0 Implemented
UU0028 # 03 Y:2002 03 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $30,500 $7,600 Implemented
UU0008 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,236 $1,844 Not Implemented
UU0008 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,523 $125 Implemented
UU0008 # 02 Y:2001 02 2001 USE SYNTHETIC LUBRICANT $423 $400 Implemented
UU0008 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,204 $460 Implemented
UU0008 # 04 Y:2001 04 2001 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $5,102 $2,600 Implemented
UU0005 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,950 $280 Implemented
UU0005 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $612 $1,575 Not Implemented
UU0005 # 04 Y:2001 04 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,070 $10,000 Not Implemented
UU0005 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,396 $300 Not Implemented
UU0005 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $798 $932 Implemented