IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,506

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0027 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,774 $180 Implemented
UU0027 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $631 $442 Not Implemented
UU0027 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $6,600 $4,500 Implemented
UU0027 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,770 $12,000 Not Implemented
UU0026 # 01 Y:2002 01 2002 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $4,189 $0 Not Implemented
UU0026 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $31,788 $2,667 Not Implemented
UU0026 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,573 $0 Implemented
UU0026 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $3,197 $3,100 Not Implemented
UU0026 # 05 Y:2002 05 2002 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $10,389 $2,110 Not Implemented
UU0026 # 06 Y:2002 06 2002 IMPROVE COMBUSTION CONTROL CAPABILITY $260 $1,200 Not Implemented
UU0026 # 07 Y:2002 07 2002 RECOVER AND REUSE WASTE MATERIAL $1,499 $0 Not Implemented
UU0025 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,405 $13,567 Implemented
UU0025 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $3,455 $3,500 Implemented
UU0025 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,913 $260 Implemented
UU0025 # 04 Y:2002 04 2002 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE $1,056 $0 Implemented
UU0025 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $3,177 $1,760 Implemented
UU0025 # 06 Y:2002 06 2002 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,285 $30 Implemented
UU0024 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,471 $30 Implemented
UU0024 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,823 $23,536 Not Implemented
UU0024 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,165 $1,441 Implemented
UU0024 # 04 Y:2002 04 2002 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $9,256 $4,600 Implemented
UU0024 # 05 Y:2002 05 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,020 $0 Implemented
UU0024 # 06 Y:2002 06 2002 $36,029 $0 Implemented
UU0024 # 07 Y:2002 07 2002 $159,659 $61,750 Not Implemented
UU0024 # 08 Y:2002 08 2002 $58,590 $720 Implemented