Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
665
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0648 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $52,176 | $5,000 | Implemented |
AM0648 # 09 Y:2013 | 09 | 2013 | USE SYNTHETIC LUBRICANT | $2,016 | $0 | Implemented |
AM0648 # 08 Y:2013 | 08 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,230 | $500 | Implemented |
AM0648 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,544 | $18,524 | Implemented |
AM0648 # 06 Y:2013 | 06 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,059 | $167 | Implemented |
AM0648 # 05 Y:2013 | 05 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,304 | $45,000 | Implemented |
AM0648 # 04 Y:2013 | 04 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,740 | $0 | Implemented |
AM0648 # 03 Y:2013 | 03 | 2013 | OPTIMIZE PLANT POWER FACTOR | $16,856 | $22,350 | Implemented |
AM0648 # 02 Y:2013 | 02 | 2013 | RECYCLE WASTE INK AND CLEANUP SOLVENT | $29,607 | $0 | Implemented |
AM0648 # 10 Y:2013 | 10 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,116 | $9 | Implemented |
AM0648 # 11 Y:2013 | 11 | 2013 | INSULATE BARE EQUIPMENT | $101 | $308 | Not Implemented |
UU0113 # 04 Y:2006 | 04 | 2006 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $87,860 | $500,000 | Not Implemented |
UU0113 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,620 | $180 | Not Implemented |
UU0113 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,530 | $20,000 | Not Implemented |
UU0113 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $173,190 | $46,250 | Not Implemented |
UU0111 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,680 | $1,560 | Not Implemented |
UU0111 # 02 Y:2006 | 02 | 2006 | INSTALL COMMON HEADER ON COMPRESSORS | $1,760 | $8,000 | Not Implemented |
UU0111 # 01 Y:2006 | 01 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $22,930 | $20,000 | Not Implemented |
UU0111 # 06 Y:2006 | 06 | 2006 | USE RADIANT HEATER FOR SPOT HEATING | $3,330 | $17,000 | Not Implemented |
UU0111 # 04 Y:2006 | 04 | 2006 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,320 | $605 | Not Implemented |
UU0111 # 05 Y:2006 | 05 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,860 | $33,500 | Not Implemented |
UU0110 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,520 | $2,095 | Not Implemented |
UU0110 # 03 Y:2006 | 03 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,350 | $6,900 | Not Implemented |
UU0110 # 05 Y:2006 | 05 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,640 | $0 | Not Implemented |
UU0110 # 02 Y:2006 | 02 | 2006 | ISOLATE HOT OR COLD EQUIPMENT | $4,260 | $3,550 | Not Implemented |