Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
87
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0126 # 06 Y:2017 | 06 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,423 | $2,000 | Implemented |
UU0126 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,358 | $90 | Implemented |
UU0126 # 04 Y:2017 | 04 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,977 | $8,120 | Not Implemented |
UU0126 # 03 Y:2017 | 03 | 2017 | REPLACE BOILER | $26,315 | $176,427 | Not Implemented |
UU0126 # 02 Y:2017 | 02 | 2017 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $27,838 | $3,980 | Implemented |
UU0126 # 01 Y:2017 | 01 | 2017 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $207,807 | $2,000,000 | Not Implemented |
UU0125 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,110 | $20 | Not Implemented |
UU0125 # 01 Y:2017 | 01 | 2017 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $32,802 | $0 | Not Implemented |
UU0125 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,851 | $18,588 | Implemented |
UU0125 # 04 Y:2017 | 04 | 2017 | RECOVER AND REUSE WASTE MATERIAL | $6,187 | $3,150 | Implemented |
UU0125 # 05 Y:2017 | 05 | 2017 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $5,417 | $39,198 | Not Implemented |
UU0125 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $4,418 | $7,220 | Implemented |
UU0125 # 07 Y:2017 | 07 | 2017 | MINIMIZE WATER USAGE | $3,700 | $200 | Implemented |
UU0125 # 08 Y:2017 | 08 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,690 | $0 | Not Implemented |
UU0124 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $5,444 | $5,000 | Implemented |
UU0124 # 01 Y:2017 | 01 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,503 | $0 | Implemented |
UU0124 # 03 Y:2017 | 03 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,630 | $3,140 | Not Implemented |
UU0124 # 04 Y:2017 | 04 | 2017 | REDUCE HEAT GAIN BY WINDOW TINTING | $3,392 | $10,800 | Not Implemented |
UU0124 # 05 Y:2017 | 05 | 2017 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $1,833 | $4,266 | Not Implemented |
UU0124 # 07 Y:2017 | 07 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $854 | $1,702 | Implemented |
UU0124 # 06 Y:2017 | 06 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $980 | $0 | Implemented |
UU0124 # 09 Y:2017 | 09 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $386 | $0 | Implemented |
UU0124 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $681 | $1,463 | Implemented |
UU0123 # 03 Y:2017 | 03 | 2017 | METER WASTE WATER | $4,100 | $0 | Not Implemented |
UU0123 # 02 Y:2017 | 02 | 2017 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,624 | $13,970 | Implemented |