IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0139 # 04 Y:2018 04 2018 INSTALL TIMERS AND/OR THERMOSTATS $446 $100 Implemented
UU0139 # 03 Y:2018 03 2018 USE PHOTOCELL CONTROLS $4,082 $2,275 Implemented
UU0139 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,262 $20,223 Implemented
UU0139 # 01 Y:2018 01 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $51,858 $44,642 Implemented
UU0138 # 06 Y:2018 06 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $599 $150 Implemented
UU0138 # 05 Y:2018 05 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $615 $0 Implemented
UU0138 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,089 $1,500 Implemented
UU0138 # 03 Y:2018 03 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,911 $0 Implemented
UU0138 # 02 Y:2018 02 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,044 $2,760 Implemented
UU0138 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,221 $18,137 Implemented
UU0137 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,310 $7,650 Implemented
UU0137 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $48,448 $23,000 Not Implemented
UU0137 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,021 $24,600 Implemented
UU0137 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $26,521 $17,000 Implemented
UU0137 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,622 $7,600 Implemented
UU0137 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $973 $3,500 Implemented
UU0136 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,814 $600 Implemented
UU0136 # 01 Y:2018 01 2018 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $159,197 $1,737,000 Not Implemented
UU0136 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,936 $17,716 Implemented
UU0136 # 03 Y:2018 03 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,124 $0 Not Implemented
UU0136 # 04 Y:2018 04 2018 INSTALL SPECTRAL REFLECTORS / DELAMP $5,731 $1,000 Not Implemented
UU0136 # 06 Y:2018 06 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $2,075 $0 Implemented
UU0136 # 08 Y:2018 08 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,192 $1,000 Not Implemented
UU0136 # 05 Y:2018 05 2018 USE PHOTOCELL CONTROLS $4,948 $420 Implemented
UU0135 # 01 Y:2018 01 2018 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $10,541 $800 Not Implemented