IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

134

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0080 # 06 Y:1997 06 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,392 $0 Not Implemented
OD0076 # 01 Y:1997 01 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,337 $1,495 Not Implemented
OD0076 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,063 $2,738 Implemented
OD0076 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $723 $882 Implemented
OD0076 # 04 Y:1997 04 1997 INSTALL TIMERS AND/OR THERMOSTATS $385 $210 Implemented
OD0076 # 05 Y:1997 05 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $996 $1,452 Not Implemented
OD0076 # 06 Y:1997 06 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $2,088 $625 Not Implemented
OD0076 # 07 Y:1997 07 1997 $6,780 $1,911 Not Implemented
OD0070 # 01 Y:1996 01 1996 USE SYNTHETIC LUBRICANT $648 $312 Not Implemented
OD0070 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $850 $800 Implemented
OD0070 # 03 Y:1996 03 1996 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $425 $100 Not Implemented
OD0070 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,667 $1,436 Implemented
OD0070 # 05 Y:1996 05 1996 BURN WASTE OIL FOR HEAT $916 $2,585 Not Implemented
OD0070 # 06 Y:1996 06 1996 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $2,486 $800 Implemented
OD0024 # 01 Y:1995 01 1995 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $3,967 $0 Implemented
OD0024 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $652 $1,625 Implemented
OD0024 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $342 $492 Not Implemented
TN0472 # 01 Y:1992 01 1992 REDUCE VENTILATION AIR $6,968 $12,000 Implemented
TN0472 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $1,087 $717 Implemented
TN0472 # 03 Y:1992 03 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,104 $960 Implemented
TN0472 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $788 $115 Implemented
TN0472 # 05 Y:1992 05 1992 IMPROVE LUBRICATION PRACTICES $197 $0 Implemented
AT0108 # 01 Y:1988 01 1988 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $41,053 $11,000 Implemented
AT0108 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,433 $5,310 Implemented
AT0108 # 03 Y:1988 03 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,258 $4,500 Implemented