IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0102 # 08 Y:1996 08 1996 RECOVER WASTE HEAT FROM EQUIPMENT $1,046 $1,688 Implemented
WV0102 # 09 Y:1996 09 1996 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $684 $0 Implemented
WV0102 # 10 Y:1996 10 1996 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,320 $100 Implemented
OD0038 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,128 $500 Not Implemented
OD0038 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $697 $465 Not Implemented
OD0038 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $72 $200 Not Implemented
OD0038 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $109 $352 Not Implemented
OD0038 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $377 $831 Not Implemented
OD0038 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $3,871 $7,073 Not Implemented
TN0489 # 01 Y:1993 01 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,207 $0 Not Implemented
TN0489 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,663 $955 Implemented
TN0489 # 03 Y:1993 03 1993 INSTALL TIMERS AND/OR THERMOSTATS $1,920 $5,250 Not Implemented
TN0489 # 04 Y:1993 04 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,499 $0 Not Implemented
TN0489 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,488 $380 Not Implemented
TN0489 # 06 Y:1993 06 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $500 $480 Implemented
TN0489 # 07 Y:1993 07 1993 OPTIMIZE PLANT POWER FACTOR $7,337 $13,300 Implemented
TN0482 # 01 Y:1993 01 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $18,977 $30,900 n/a
TN0482 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,459 $1,504 n/a
TN0482 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,234 $600 n/a
TN0482 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $923 $185 n/a
TN0482 # 05 Y:1993 05 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $277 $720 n/a
TN0482 # 06 Y:1993 06 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,141 $0 n/a
TN0383 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $5,046 $0 Implemented
TN0383 # 02 Y:1989 02 1989 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $1,484 $3,200 Implemented
TN0383 # 03 Y:1989 03 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,204 $4,800 Not Implemented