Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0702 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $868 | $3,000 | Implemented |
MA0702 # 03 Y:2012 | 03 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,102 | $2,210 | Not Implemented |
MA0702 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,144 | $1,500 | Implemented |
MA0702 # 01 Y:2012 | 01 | 2012 | REDUCE FLUID FLOW RATES | $11,375 | $9,400 | Implemented |
MA0699 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $706 | $100 | Implemented |
MA0699 # 05 Y:2012 | 05 | 2012 | USE HEAT PUMP FOR SPACE CONDITIONING | $1,250 | $6,500 | Implemented |
MA0699 # 04 Y:2012 | 04 | 2012 | ELIMINATE/REDUCE AN OPERATION | $1,855 | $500 | Not Implemented |
MA0699 # 03 Y:2012 | 03 | 2012 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $5,019 | $24,000 | Implemented |
MA0699 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,627 | $104,325 | Implemented |
MA0699 # 01 Y:2012 | 01 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $25,140 | $9,900 | Implemented |
MA0696 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,462 | $6,035 | Not Implemented |
MA0696 # 09 Y:2012 | 09 | 2012 | INSULATE BARE EQUIPMENT | $622 | $1,100 | Not Implemented |
MA0696 # 08 Y:2012 | 08 | 2012 | INSTALL OCCUPANCY SENSORS | $1,705 | $4,080 | Implemented |
MA0696 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,810 | $200 | Implemented |
MA0696 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,048 | $6,600 | Implemented |
MA0696 # 04 Y:2012 | 04 | 2012 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,539 | $17,500 | Not Implemented |
MA0696 # 03 Y:2012 | 03 | 2012 | USE OPTIMUM TEMPERATURE | $6,647 | $4,000 | Not Implemented |
MA0696 # 02 Y:2012 | 02 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $15,781 | $2,800 | Implemented |
MA0696 # 01 Y:2012 | 01 | 2012 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $19,393 | $39,000 | Implemented |
MA0687 # 01 Y:2012 | 01 | 2012 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $50,722 | $198,500 | Not Implemented |
MA0687 # 08 Y:2012 | 08 | 2012 | INSULATE BARE EQUIPMENT | $637 | $1,250 | Not Implemented |
MA0687 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,306 | $4,500 | Not Implemented |
MA0687 # 06 Y:2012 | 06 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,065 | $11,500 | Implemented |
MA0687 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,857 | $9,000 | Implemented |
MA0687 # 04 Y:2012 | 04 | 2012 | CONDENSE OPERATION INTO ONE BUILDING | $5,375 | $1,000 | Not Implemented |