IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0702 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $868 $3,000 Implemented
MA0702 # 03 Y:2012 03 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,102 $2,210 Not Implemented
MA0702 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,144 $1,500 Implemented
MA0702 # 01 Y:2012 01 2012 REDUCE FLUID FLOW RATES $11,375 $9,400 Implemented
MA0699 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $706 $100 Implemented
MA0699 # 05 Y:2012 05 2012 USE HEAT PUMP FOR SPACE CONDITIONING $1,250 $6,500 Implemented
MA0699 # 04 Y:2012 04 2012 ELIMINATE/REDUCE AN OPERATION $1,855 $500 Not Implemented
MA0699 # 03 Y:2012 03 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $5,019 $24,000 Implemented
MA0699 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,627 $104,325 Implemented
MA0699 # 01 Y:2012 01 2012 INSTALL TIMERS AND/OR THERMOSTATS $25,140 $9,900 Implemented
MA0696 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,462 $6,035 Not Implemented
MA0696 # 09 Y:2012 09 2012 INSULATE BARE EQUIPMENT $622 $1,100 Not Implemented
MA0696 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $1,705 $4,080 Implemented
MA0696 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,810 $200 Implemented
MA0696 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,048 $6,600 Implemented
MA0696 # 04 Y:2012 04 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,539 $17,500 Not Implemented
MA0696 # 03 Y:2012 03 2012 USE OPTIMUM TEMPERATURE $6,647 $4,000 Not Implemented
MA0696 # 02 Y:2012 02 2012 REPAIR AND ELIMINATE STEAM LEAKS $15,781 $2,800 Implemented
MA0696 # 01 Y:2012 01 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $19,393 $39,000 Implemented
MA0687 # 01 Y:2012 01 2012 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $50,722 $198,500 Not Implemented
MA0687 # 08 Y:2012 08 2012 INSULATE BARE EQUIPMENT $637 $1,250 Not Implemented
MA0687 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,306 $4,500 Not Implemented
MA0687 # 06 Y:2012 06 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,065 $11,500 Implemented
MA0687 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,857 $9,000 Implemented
MA0687 # 04 Y:2012 04 2012 CONDENSE OPERATION INTO ONE BUILDING $5,375 $1,000 Not Implemented