Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,765
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2501 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $8,699 | $6,545 | n/a |
UW2501 # 02 Y:2025 | 02 | 2025 | REPAIR OR REPLACE STEAM TRAPS | $83,082 | $9,800 | n/a |
UW2501 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,175 | $10,269 | n/a |
UW2501 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $41,957 | $25,000 | n/a |
UW2501 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,682 | $32,756 | n/a |
OR0800 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,219 | $9,036 | n/a |
OR0800 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $77,631 | $300,000 | n/a |
OR0800 # 01 Y:2024 | 01 | 2024 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $5,407 | $0 | n/a |
OR0800 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,775 | $10,104 | n/a |
UW2414 # 06 Y:2024 | 06 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $36,181 | $110,000 | Implemented |
UW2414 # 08 Y:2024 | 08 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $24,539 | $52,000 | Implemented |
UW2414 # 09 Y:2024 | 09 | 2024 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $252,286 | $90,000 | Implemented |
UW2414 # 11 Y:2024 | 11 | 2024 | USE OTHER METHODS FOR NEUTRALIZATION | $13,133 | $58,000 | Implemented |
UW2414 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $141 | $220 | Implemented |
UW2414 # 05 Y:2024 | 05 | 2024 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $57,690 | $7,906 | Implemented |
UW2414 # 04 Y:2024 | 04 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $92,758 | $115,000 | Implemented |
UW2414 # 02 Y:2024 | 02 | 2024 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $16,683 | $96,069 | Implemented |
UW2414 # 03 Y:2024 | 03 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $812 | $1,219 | Implemented |
UW2414 # 10 Y:2024 | 10 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,737 | $25,000 | Implemented |
UW2414 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,019 | $162,415 | Implemented |
UW2413 # 02 Y:2024 | 02 | 2024 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $25,793 | $13,368 | Implemented |
UW2413 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $53 | $229 | Implemented |
UW2413 # 06 Y:2024 | 06 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,582 | $7,250 | Implemented |
UW2413 # 03 Y:2024 | 03 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $20,435 | $58,800 | Implemented |
UW2413 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,186 | $5,713 | Implemented |