IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0724 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,462 $218 Not Implemented
OR0724 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,124 $3,891 Not Implemented
OR0724 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $10,104 $18,004 Not Implemented
BS0061 # 02 Y:2015 02 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,959 $5,665 Not Implemented
BS0061 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,605 $74,360 Implemented
BS0061 # 04 Y:2015 04 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $871 $2,550 Not Implemented
BS0061 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $223 $702 Implemented
OR0597 # 02 Y:2012 02 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $41,834 $41,834 Not Implemented
OR0597 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,892 $11,892 Not Implemented
OR0597 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,480 $9,480 Implemented
OR0597 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $3,853 $3,853 Implemented
UW0042 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $702,459 $5,700,000 Not Implemented
UW0042 # 02 Y:2010 02 2010 UPGRADE CONTROLS ON COMPRESSORS $26,153 $26,153 Not Implemented
UW0042 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,225 $81,585 Implemented
UW0028 # 02 Y:2009 02 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $323,442 $485,164 Not Implemented
UW0028 # 01 Y:2009 01 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,467,516 $2,201,270 Not Implemented
UW0028 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $0 Implemented
UW0028 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,942 $76,700 Implemented
UW0028 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $12,524 $1,960 Implemented
UW0028 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,663 $31,539 Not Implemented
UW0028 # 06 Y:2009 06 2009 METER WASTE WATER $1,060 $12,000 Implemented
UW0028 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $847 $560 Not Implemented
UW0025 # 04 Y:2009 04 2009 DEVELOP A REPAIR/REPLACE POLICY $2,986 $6,091 Implemented
UW0025 # 03 Y:2009 03 2009 USE OPTIMUM TEMPERATURE $13,200 $19,800 Implemented
UW0025 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,361 $17,335 Not Implemented