IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0320 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,078 $7,300 Implemented
OR0320 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,009 $9,609 Implemented
OR0320 # 06 Y:1998 06 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $27,785 $0 Implemented
OR0320 # 07 Y:1998 07 1998 $94,439 $150,000 Not Implemented
OR0320 # 08 Y:1998 08 1998 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $5,087 $6,000 Not Implemented
OR0320 # 09 Y:1998 09 1998 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,387 $0 Not Implemented
OR0320 # 10 Y:1998 10 1998 INSULATE BARE EQUIPMENT $6,161 $217 Not Implemented
OR0310 # 07 Y:1997 07 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $698 $2,017 Not Implemented
OR0310 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $169 $670 Implemented
OR0310 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,635 $2,500 Implemented
OR0310 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $2,930 $8,750 Not Implemented
OR0310 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $4,309 $2,320 Not Implemented
OR0310 # 02 Y:1997 02 1997 $9,625 $14,810 Not Implemented
OR0310 # 01 Y:1997 01 1997 USE PLASTIC PALLETS INSTEAD OF WOOD $11,530 $1,830 Implemented
OR0256 # 02 Y:1996 02 1996 RECOVER WASTE HEAT FROM EQUIPMENT $1,920 $1,190 Not Implemented
OR0256 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $1,860 $2,290 Not Implemented
OR0256 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $830 $2,626 Implemented
OR0256 # 05 Y:1996 05 1996 OPTIMIZE PLANT POWER FACTOR $2,259 $6,400 Not Implemented
OR0256 # 06 Y:1996 06 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,660 $16,440 Implemented
OR0256 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $576 $6,630 Implemented
OR0256 # 01 Y:1996 01 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,446 $560 Implemented