IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0013 # 05 Y:2013 05 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $312 $77 Implemented
BS0013 # 06 Y:2013 06 2013 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,270 $360 Not Implemented
BS0011 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,102 $973 Implemented
BS0011 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $4,008 $6,725 Implemented
BS0011 # 03 Y:2012 03 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $15,728 $29,500 Not Implemented
BS0011 # 04 Y:2012 04 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,878 $6,670 Not Implemented
BS0011 # 05 Y:2012 05 2012 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $8,243 $900 Not Implemented
BS0011 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $250 $600 Implemented
OR0593 # 01 Y:2012 01 2012 USE MORE EFFICIENT ADHESIVE APPLICATORS $72,379 $43,800 Not Implemented
OR0593 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,751 $4,751 Implemented
OR0593 # 03 Y:2012 03 2012 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $2,514 $900 Not Implemented
OR0593 # 04 Y:2012 04 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $930 $2,250 Not Implemented
OR0593 # 05 Y:2012 05 2012 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $8,590 $34,684 Not Implemented
UW0033 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $9,132 $0 Not Implemented
UW0033 # 02 Y:2010 02 2010 DISTILL CONTAMINATED SOLVENTS FOR REUSE $7,344 $0 Not Implemented
UW0033 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $5,340 $0 Not Implemented
UW0033 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $620 $0 Not Implemented
UW0033 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $429 $0 Implemented
UW0033 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $292 $0 Not Implemented
UW0032 # 01 Y:2009 01 2009 INSULATE BARE EQUIPMENT $8,800 $7,248 Not Implemented
UW0032 # 02 Y:2009 02 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,782 $31,747 Implemented
UW0032 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,643 $10,000 Implemented
UW0032 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,065 $3,070 Implemented
UW0032 # 05 Y:2009 05 2009 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $297 $200 Implemented
OR0542 # 01 Y:2008 01 2008 Solar $112,205 $783,772 Not Implemented