Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0025 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $829 $977 Not Implemented
BS0025 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $444 $15 Not Implemented
BS0025 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $208 $1,211 Not Implemented
BS0025 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $626 $495 Not Implemented
BS0025 # 02 Y:2013 02 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,537 $6,138 Not Implemented
BS0025 # 01 Y:2013 01 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,335 $1,104 Not Implemented
OR0621 # 01 Y:2013 01 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $1,962 $2,256 Not Implemented
OR0621 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,765 $65,592 Implemented
OR0621 # 03 Y:2013 03 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $423 $13,505 Not Implemented
OR0620 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $456 $163 Not Implemented
OR0620 # 01 Y:2013 01 2013 PURCHASE EQUIPMENT INSTEAD OF LEASING $50,574 $68,750 Not Implemented
OR0620 # 02 Y:2013 02 2013 REDUCE VENTILATION AIR $28,525 $3,200 Not Implemented
OR0620 # 05 Y:2013 05 2013 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $584 $2,554 Not Implemented
OR0620 # 04 Y:2013 04 2013 MODIFY STARTUP/SHUTDOWN TIMES $442 $481 Not Implemented
OR0619 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,300 $50,000 Not Implemented
OR0619 # 02 Y:2013 02 2013 REDUCE FLUID FLOW RATES $2,879 $6,200 Not Implemented
OR0619 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $4,550 $13,225 Not Implemented
OR0619 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $679 $1,677 Not Implemented
OR0619 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,667 $2,342 Not Implemented
OR0619 # 01 Y:2013 01 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $7,073 $2,342 Not Implemented
OR0615 # 03 Y:2013 03 2013 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $791,616 $300,000 Not Implemented
OR0615 # 02 Y:2013 02 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $48,896 $68,866 Implemented
OR0615 # 01 Y:2013 01 2013 ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING $24,283 $1,000 Implemented
OR0615 # 04 Y:2013 04 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,731 $17,127 Implemented
OR0615 # 05 Y:2013 05 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,352 $36,600 Not Implemented