IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0675 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,809 $23,810 Implemented
OR0675 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,062 $1,969 Implemented
OR0675 # 01 Y:2016 01 2016 INSTALL EQUIPMENT TO MOVE PRODUCT $79,123 $89,654 Implemented
OR0675 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,199 $7,215 Not Implemented
BS0084 # 04 Y:2016 04 2016 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $751 $243 Not Implemented
BS0084 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $118 $264 Not Implemented
BS0084 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,738 $825 Not Implemented
BS0084 # 02 Y:2016 02 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,854 $15 Not Implemented
BS0084 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,444 $31,350 Not Implemented
OR0674 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,953 $0 Implemented
OR0674 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,376 $4,258 Implemented
OR0674 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,868 $0 Not Implemented
OR0673 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,464 $0 Implemented
OR0673 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,117 $5,344 Implemented
OR0673 # 01 Y:2016 01 2016 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $157,793 $301,613 Not Implemented
OR0673 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $102,571 $10,390 Not Implemented
OR0673 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $4,333 $229 Not Implemented
BS0079 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $154 $148 Implemented
BS0079 # 01 Y:2016 01 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,545 $6,216 Not Implemented
BS0079 # 03 Y:2016 03 2016 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $232 $850 Not Implemented
BS0073 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,122 $220 Not Implemented
BS0073 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $151 $2,312 Not Implemented
BS0073 # 06 Y:2016 06 2016 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $582 $316 Not Implemented
BS0073 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $108 $47 Not Implemented
BS0073 # 03 Y:2016 03 2016 USE OPTIMUM TEMPERATURE $419 $116 Not Implemented