IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0567 # 05 Y:2016 05 2016 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $1,259 $500 Not Implemented
IA0567 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,604 $8,596 Not Implemented
IA0567 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,535 $1,320 Not Implemented
IA0567 # 02 Y:2016 02 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,956 $7,888 Not Implemented
IA0567 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,409 $75,175 Not Implemented
WM0083 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $34,888 $8,785 Not Implemented
WM0083 # 01 Y:2016 01 2016 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $61,468 $22,995 Not Implemented
WM0083 # 08 Y:2016 08 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $273 $695 Not Implemented
WM0083 # 07 Y:2016 07 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,105 $2,490 Implemented
WM0083 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $1,673 $1,425 Implemented
WM0083 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $12,261 $1,680 Not Implemented
WM0083 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,901 $15,200 Implemented
WM0083 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $27,491 $7,200 Implemented
WM0082 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,792 $280 Implemented
WM0082 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $5,195 $825 Not Implemented
WM0082 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,011 $3,340 Implemented
WM0082 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,220 $23,066 Implemented
WM0082 # 01 Y:2016 01 2016 RECOVER WASTE HEAT FROM EQUIPMENT $15,282 $26,000 Not Implemented
WM0082 # 06 Y:2016 06 2016 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $5,896 $2,068 Not Implemented
WM0082 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,050 $1,650 Not Implemented
WM0082 # 08 Y:2016 08 2016 USE SYNTHETIC LUBRICANT $2,423 $9,400 Not Implemented
WM0080 # 06 Y:2016 06 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,275 $1,589 Not Implemented
WM0080 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,338 $0 Implemented
WM0080 # 03 Y:2016 03 2016 USE SYNTHETIC LUBRICANT $3,352 $1,507 Not Implemented
WM0080 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,385 $1,225 Implemented