IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

245

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0393 # 03 Y:2001 03 2001 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $9,162 $11,500 n/a
WI0393 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,714 $7,393 n/a
WI0393 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $147 $75 n/a
WI0393 # 06 Y:2001 06 2001 USE A RAG RECYCLE SERVICE $1,404 $0 n/a
WI0393 # 07 Y:2001 07 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $820 $640 n/a
WI0393 # 08 Y:2001 08 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $585 $403 n/a
WI0391 # 01 Y:2001 01 2001 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $19,523 $0 Not Implemented
WI0391 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,794 $90 Implemented
WI0391 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $393 $640 Implemented
WI0391 # 04 Y:2001 04 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,913 $971 Not Implemented
WI0391 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $372 $2,000 Not Implemented
WI0391 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $364 $283 Not Implemented
WI0391 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $0 Not Implemented
WI0338 # 01 Y:1999 01 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $15,106 $0 n/a
WI0338 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,524 $20,900 n/a
WI0338 # 03 Y:1999 03 1999 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $4,369 $7,590 n/a
WI0338 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $2,410 $7,200 n/a
WI0338 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,072 $210 n/a
WI0338 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $434 $640 n/a
WI0338 # 07 Y:1999 07 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,906 $6,000 n/a
WI0338 # 08 Y:1999 08 1999 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,671 $0 n/a
WI0338 # 09 Y:1999 09 1999 $828 $0 n/a
WI0338 # 10 Y:1999 10 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $107 $0 n/a
WI0320 # 01 Y:1998 01 1998 $98,187 $100,000 Not Implemented
WI0320 # 02 Y:1998 02 1998 INSTALL TIMERS AND/OR THERMOSTATS $4,771 $600 Not Implemented