IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
SIC 3365 Aluminum Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0134 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,318 $20,000 Not Implemented
WM0134 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $18,166 $70,712 Not Implemented
WI0475 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,127 $1,976 Implemented
WI0475 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,924 $80 Implemented
WI0475 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,987 $1,920 Implemented
WI0475 # 05 Y:2004 05 2004 USE SYNTHETIC LUBRICANT $4,236 $0 Not Implemented
WI0475 # 04 Y:2004 04 2004 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $6,708 $0 Not Implemented
WI0475 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,417 $33,120 Implemented
WI0475 # 02 Y:2004 02 2004 COVER OPEN TANKS $18,376 $1,000 Implemented
WI0475 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $97,164 $40,200 Not Implemented
WI0475 # 09 Y:2004 09 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,527 $5,140 Not Implemented
WI0469 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $626 $0 Implemented
WI0469 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,616 $14,400 Not Implemented
WI0469 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,071 $0 Implemented
WI0469 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $588 $249 Implemented
WI0469 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $463 $640 Not Implemented
WI0469 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $258 $107 Implemented
WI0388 # 08 Y:2001 08 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $190 $0 Not Implemented
WI0388 # 07 Y:2001 07 2001 INSTALL TIMERS AND/OR THERMOSTATS $336 $200 Not Implemented
WI0388 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $613 $562 Not Implemented
WI0388 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,265 $1,000 Not Implemented
WI0388 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,411 $480 Not Implemented
WI0388 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,744 $1,580 Not Implemented
WI0388 # 02 Y:2001 02 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,134 $0 Not Implemented
WI0388 # 01 Y:2001 01 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $10,705 $54,000 Not Implemented