Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0455 # 03 Y:2003 03 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,687 $1,000 Not Implemented
WI0455 # 02 Y:2003 02 2003 $12,503 $2,000 Not Implemented
WI0455 # 01 Y:2003 01 2003 $17,710 $2,500 Implemented
WI0455 # 04 Y:2003 04 2003 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,787 $0 Not Implemented
WI0455 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,232 $1,240 Not Implemented
WI0455 # 06 Y:2003 06 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $716 $0 Not Implemented
WI0453 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $47,771 $18,500 Not Implemented
WI0453 # 02 Y:2003 02 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $22,445 $40,000 Not Implemented
WI0453 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,041 $18,315 Implemented
WI0453 # 04 Y:2003 04 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,824 $8,700 Not Implemented
WI0453 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,121 $1,280 Implemented
WI0453 # 06 Y:2003 06 2003 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,657 $20,000 Not Implemented
WI0442 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,332 $6,498 Not Implemented
WI0442 # 05 Y:2003 05 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,559 $500 Not Implemented
WI0442 # 04 Y:2003 04 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,640 $10,000 Not Implemented
WI0442 # 03 Y:2003 03 2003 USE POWER DURING OFF-PEAK PERIODS $5,132 $0 Not Implemented
WI0442 # 01 Y:2003 01 2003 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $188,665 $146,300 Not Implemented
WI0441 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $168 $640 Not Implemented
WI0441 # 04 Y:2003 04 2003 USE POWER DURING OFF-PEAK PERIODS $1,486 $0 Not Implemented
WI0441 # 01 Y:2003 01 2003 INCREASE USE OF AUTOMATION $66,563 $30,000 Not Implemented
WI0441 # 03 Y:2003 03 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $2,550 $0 Implemented
WI0441 # 02 Y:2003 02 2003 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,650 $16,800 Implemented
WI0440 # 03 Y:2003 03 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $700 $100 Not Implemented
WI0440 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $617 $2,400 Not Implemented
WI0440 # 02 Y:2003 02 2003 ADJUST BURNERS FOR EFFICIENT OPERATION $1,887 $500 Not Implemented