IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

169

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0090 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,918 $300 Implemented
IC0090 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,932 $425 Not Implemented
IC0090 # 04 Y:2004 04 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,643 $9,400 Implemented
IC0090 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $559 $77 Implemented
IC0090 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,205 $30,427 Not Implemented
IC0090 # 01 Y:2004 01 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $17,317 $0 Implemented
WI0480 # 02 Y:2004 02 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $3,606 $500 Implemented
WI0480 # 10 Y:2004 10 2004 INSULATE BARE EQUIPMENT $364 $160 Implemented
WI0480 # 11 Y:2004 11 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $137 $0 Implemented
WI0480 # 09 Y:2004 09 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $372 $600 Not Implemented
WI0480 # 08 Y:2004 08 2004 REPAIR AND ELIMINATE STEAM LEAKS $554 $0 Implemented
WI0480 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,496 $640 Not Implemented
WI0480 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,595 $150 Not Implemented
WI0480 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,086 $5,500 Not Implemented
WI0480 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,263 $39,140 Not Implemented
WI0480 # 07 Y:2004 07 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $634 $1,500 Implemented
WI0480 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $1,779 $600 Not Implemented
WI0479 # 02 Y:2004 02 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,744 $18,000 Not Implemented
WI0479 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,122 $11,520 n/a
WI0479 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $1,186 $774 Not Implemented
WI0479 # 01 Y:2004 01 2004 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $16,108 $12,000 Not Implemented
WI0479 # 04 Y:2004 04 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,229 $0 Not Implemented
WI0479 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $667 $1,020 Not Implemented
WI0479 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,022 $0 Implemented
WI0479 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $670 $640 Not Implemented