IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

107

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0493 # 02 Y:2014 02 2014 USE DEMAND CONTROLLER OR LOAD SHEDDER $19,168 $5,300 Implemented
WV0493 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,848 $509 Implemented
WV0493 # 04 Y:2014 04 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,786 $1,000 Implemented
WV0493 # 05 Y:2014 05 2014 UPGRADE CONTROLS ON COMPRESSORS $5,218 $10,000 Implemented
WV0493 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,192 $7,244 Implemented
WV0493 # 07 Y:2014 07 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,090 $0 Not Implemented
WV0493 # 08 Y:2014 08 2014 INSULATE BARE EQUIPMENT $3,507 $1,251 Implemented
WV0493 # 09 Y:2014 09 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,643 $15 Implemented
WV0493 # 10 Y:2014 10 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,071 $1,000 Not Implemented
WV0493 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $1,391 $661 Not Implemented
WV0407 # 01 Y:2010 01 2010 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM $622,016 $798,300 Not Implemented
WV0407 # 02 Y:2010 02 2010 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $542,540 $1,200,000 Not Implemented
WV0407 # 03 Y:2010 03 2010 REPAIR OR REPLACE STEAM TRAPS $235,631 $5,500 Implemented
WV0407 # 04 Y:2010 04 2010 USE RADIANT HEATER FOR SPOT HEATING $43,962 $96,200 Not Implemented
WV0407 # 05 Y:2010 05 2010 DIRECT WARMEST AIR TO COMBUSTION INTAKE $20,301 $7,920 Not Implemented
WV0407 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $19,102 $43,400 Not Implemented
WV0407 # 07 Y:2010 07 2010 DEVELOP A REPAIR/REPLACE POLICY $10,842 $772 Implemented
WV0407 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,003 $17,348 Implemented
WV0407 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,209 $7,158 Implemented
WV0407 # 10 Y:2010 10 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,353 $1,000 Implemented
WV0397 # 01 Y:2009 01 2009 REDUCE VENTILATION AIR $153,645 $145,000 Not Implemented
WV0397 # 02 Y:2009 02 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $81,057 $131,239 Not Implemented
WV0397 # 03 Y:2009 03 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $77,885 $17,000 Not Implemented
WV0397 # 04 Y:2009 04 2009 OPERATE BOILERS ON HIGH FIRE SETTING $56,916 $80,000 Not Implemented
WV0397 # 05 Y:2009 05 2009 OPTIMIZE PLANT POWER FACTOR $40,984 $44,000 Not Implemented