IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0250 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $765 $30 Implemented
WV0250 # 08 Y:2002 08 2002 REPLACE BOILER $65,563 $100,000 Not Implemented
WV0250 # 05 Y:2002 05 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,266 $300 Implemented
WV0250 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $718 $230 Not Implemented
WV0250 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150 $0 Implemented
WV0250 # 10 Y:2002 10 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $900 $665 Not Implemented
WV0250 # 12 Y:2002 12 2002 INSTALL SENSORS TO DETECT DEFECTS $11,505 $13,600 Not Implemented
WV0250 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $1,387 $188 Implemented
WV0250 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,500 $0 Implemented
WV0250 # 03 Y:2002 03 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,399 $1,000 Implemented
WV0250 # 09 Y:2002 09 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,056 $3,735 Not Implemented
WV0250 # 11 Y:2002 11 2002 CHANGE OPERATING CONDITIONS $21,375 $875 Not Implemented
WV0243 # 10 Y:2002 10 2002 UTILIZE OUTSIDE CONTRACTING $87,058 $1,100 Not Implemented
WV0243 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $38,997 $220 Implemented
WV0243 # 09 Y:2002 09 2002 MINIMIZE WATER USAGE $8,228 $10,000 Not Implemented
WV0243 # 08 Y:2002 08 2002 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $8,000 $9,750 Not Implemented
WV0243 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $2,317 $777 Implemented
WV0243 # 06 Y:2002 06 2002 USE PHOTOCELL CONTROLS $1,799 $1,500 Not Implemented
WV0243 # 05 Y:2002 05 2002 REPAIR AND ELIMINATE STEAM LEAKS $45,099 $1,050 Implemented
WV0243 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,642 $2,800 Not Implemented
WV0243 # 03 Y:2002 03 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $38,007 $550 Implemented
WV0243 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $520 $150 Implemented
WV0242 # 11 Y:2002 11 2002 INSTALL SENSORS TO DETECT DEFECTS $127,500 $13,480 Not Implemented
WV0242 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $456 $72 Implemented
WV0242 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,564 $128 Implemented