Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0636 # 01 Y:2022 | 01 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,183 | $4,755 | Not Implemented |
WV0636 # 09 Y:2022 | 09 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,943 | $7,374 | Not Implemented |
WV0636 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $670 | $78 | Implemented |
WV0636 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,625 | $18,739 | Implemented |
WV0636 # 03 Y:2022 | 03 | 2022 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $4,546 | $5,490 | Not Implemented |
WV0636 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $299 | $465 | Implemented |
WV0636 # 05 Y:2022 | 05 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $1,927 | $2,021 | Implemented |
WV0636 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,868 | $465 | Implemented |
WV0636 # 08 Y:2022 | 08 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $217 | $598 | Implemented |
WV0635 # 10 Y:2022 | 10 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $546 | $1,571 | Implemented |
WV0635 # 09 Y:2022 | 09 | 2022 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $672 | $1,500 | Implemented |
WV0635 # 05 Y:2022 | 05 | 2022 | INSTALL SET-BACK TIMERS | $3,167 | $1,125 | Not Implemented |
WV0635 # 02 Y:2022 | 02 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $4,325 | $5,360 | Not Implemented |
WV0635 # 08 Y:2022 | 08 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $949 | $525 | Implemented |
WV0635 # 11 Y:2022 | 11 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $57 | $88 | Implemented |
WV0635 # 07 Y:2022 | 07 | 2022 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,027 | $394 | Implemented |
WV0635 # 04 Y:2022 | 04 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $3,209 | $6,354 | Not Implemented |
WV0635 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,309 | $218 | Implemented |
WV0635 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,990 | $4,945 | Implemented |
WV0635 # 01 Y:2022 | 01 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,179 | $6,500 | Not Implemented |
WV0633 # 10 Y:2022 | 10 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $246 | $878 | Implemented |
WV0633 # 07 Y:2022 | 07 | 2022 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,011 | $1,500 | Implemented |
WV0633 # 01 Y:2022 | 01 | 2022 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $14,598 | $23,000 | Not Implemented |
WV0633 # 03 Y:2022 | 03 | 2022 | DIRECT WASTE GASSES TO BOILER COMBUSTION AIR | $4,724 | $12,236 | Not Implemented |
WV0633 # 04 Y:2022 | 04 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $4,626 | $4,080 | Not Implemented |