Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
118
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0672 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $3,058 | $6,936 | n/a |
WV0672 # 12 Y:2024 | 12 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $401 | $38 | n/a |
WV0672 # 09 Y:2024 | 09 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,102 | $753 | n/a |
WV0672 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,640 | $5,016 | n/a |
WV0672 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,087 | $759 | n/a |
WV0672 # 02 Y:2024 | 02 | 2024 | USE EVAPORATION TO CONCENTRATE MATERIAL | $24,278 | $31,216 | n/a |
WV0672 # 11 Y:2024 | 11 | 2024 | OPTIMIZE PLANT POWER FACTOR | $596 | $2,964 | n/a |
WV0672 # 03 Y:2024 | 03 | 2024 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $20,948 | $26,406 | n/a |
WV0672 # 10 Y:2024 | 10 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $797 | $1,579 | n/a |
WV0672 # 06 Y:2024 | 06 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,489 | $5,659 | n/a |
WV0672 # 13 Y:2024 | 13 | 2024 | INSTALL OCCUPANCY SENSORS | $334 | $984 | n/a |
WV0672 # 01 Y:2024 | 01 | 2024 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $73,416 | $271,368 | n/a |
WV0672 # 04 Y:2024 | 04 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,264 | $9,760 | n/a |
WV0674 # 06 Y:2024 | 06 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $562 | $2,318 | n/a |
WV0674 # 08 Y:2024 | 08 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $225 | $88 | n/a |
WV0674 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,766 | $8,674 | n/a |
WV0674 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $658 | $3,214 | n/a |
WV0674 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,331 | $12,440 | n/a |
WV0674 # 09 Y:2024 | 09 | 2024 | INSULATE BARE EQUIPMENT | $148 | $482 | n/a |
WV0674 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $393 | $122 | n/a |
WV0674 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,374 | $8,262 | n/a |
WV0674 # 04 Y:2024 | 04 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $696 | $1,133 | n/a |
WV0670 # 09 Y:2024 | 09 | 2024 | INSULATE BARE EQUIPMENT | $878 | $581 | n/a |
WV0670 # 10 Y:2024 | 10 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $666 | $148 | n/a |
WV0670 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,506 | $770 | n/a |