Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OD0105 # 03 Y:1998 | 03 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,120 | $5,907 | Implemented |
OD0105 # 04 Y:1998 | 04 | 1998 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,362 | $0 | Not Implemented |
OD0105 # 01 Y:1998 | 01 | 1998 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $56,890 | $175,200 | Implemented |
OD0105 # 02 Y:1998 | 02 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,837 | $38,044 | Implemented |
ME0234 # 08 Y:1998 | 08 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $150 | $0 | Not Implemented |
ME0234 # 07 Y:1998 | 07 | 1998 | RECOVER AND REUSE COOLING WATER | $12,512 | $12,000 | Implemented |
ME0234 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $19,979 | $12,932 | Implemented |
ME0234 # 09 Y:1998 | 09 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,887 | $3,000 | Not Implemented |
ME0234 # 01 Y:1998 | 01 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $38,400 | $50,000 | Implemented |
ME0234 # 05 Y:1998 | 05 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,284 | $800 | Implemented |
ME0234 # 04 Y:1998 | 04 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,482 | $4,476 | Implemented |
ME0234 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,153 | $10,580 | Implemented |
ME0234 # 06 Y:1998 | 06 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $975 | $500 | Implemented |
ME0234 # 10 Y:1998 | 10 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $1,114 | $7,000 | Implemented |
UL0212 # 01 Y:1998 | 01 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,802 | $100 | n/a |
UL0212 # 04 Y:1998 | 04 | 1998 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $1,567 | $5,070 | n/a |
UL0212 # 02 Y:1998 | 02 | 1998 | OPTIMIZE PLANT POWER FACTOR | $3,040 | $2,176 | n/a |
UL0212 # 03 Y:1998 | 03 | 1998 | MINIMIZE USE OF RAGS THROUGH WORKER TRAINING | $3,175 | $1,625 | n/a |
UL0212 # 05 Y:1998 | 05 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $26,000 | $3,120 | n/a |
MA0423 # 05 Y:1998 | 05 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $585 | $2,627 | Implemented |
MA0423 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,841 | $2,700 | Implemented |
MA0423 # 07 Y:1998 | 07 | 1998 | INSTALL OCCUPANCY SENSORS | $149 | $257 | Not Implemented |
MA0423 # 06 Y:1998 | 06 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $187 | $294 | Not Implemented |
MA0423 # 01 Y:1998 | 01 | 1998 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,806 | $300 | Implemented |
MA0423 # 04 Y:1998 | 04 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,279 | $80,000 | Not Implemented |