Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0244 # 09 Y:2017 | 09 | 2017 | USE SOLAR HEAT TO HEAT WATER | $5,690 | $96,550 | Not Implemented |
MZ0244 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $150 | $280 | Implemented |
MZ0244 # 06 Y:2017 | 06 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,568 | $2,900 | Implemented |
MZ0244 # 07 Y:2017 | 07 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $58,749 | $17,550 | Implemented |
MZ0244 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,371 | $0 | Implemented |
MZ0244 # 08 Y:2017 | 08 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $966 | $4,050 | Not Implemented |
MZ0244 # 05 Y:2017 | 05 | 2017 | USE COMPRESSOR AIR FILTERS | $2,071 | $900 | Implemented |
MZ0244 # 01 Y:2017 | 01 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $20,566 | $0 | Implemented |
MZ0244 # 02 Y:2017 | 02 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,898 | $46,100 | Implemented |
UF0514 # 04 Y:2017 | 04 | 2017 | REDUCE EXCESS STEAM BLEEDING | $4,320 | $0 | Implemented |
UF0514 # 07 Y:2017 | 07 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,432 | $0 | Implemented |
UF0514 # 06 Y:2017 | 06 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,693 | $6,775 | Implemented |
UF0514 # 02 Y:2017 | 02 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,847 | $20,000 | Implemented |
UF0514 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,154 | $30,844 | Implemented |
UF0514 # 03 Y:2017 | 03 | 2017 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,710 | $7,580 | Not Implemented |
UF0514 # 05 Y:2017 | 05 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,740 | $2,882 | Implemented |
UA0187 # 01 Y:2017 | 01 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,441 | $1,892 | Not Implemented |
UA0187 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,032 | $136,663 | Implemented |
UA0187 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $67,895 | $250 | Not Implemented |
UA0187 # 04 Y:2017 | 04 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $33,082 | $14,405 | Not Implemented |
UA0187 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,219 | $6,260 | Implemented |
UA0187 # 06 Y:2017 | 06 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $88,008 | $0 | Implemented |
UU0126 # 03 Y:2017 | 03 | 2017 | REPLACE BOILER | $26,315 | $176,427 | Not Implemented |
UU0126 # 02 Y:2017 | 02 | 2017 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $27,838 | $3,980 | Implemented |
UU0126 # 01 Y:2017 | 01 | 2017 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $207,807 | $2,000,000 | Not Implemented |