IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0795 # 09 Y:2004 09 2004 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $18,125 $6,300 Not Implemented
GT0795 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,570 $2,910 Not Implemented
UU0077 # 01 Y:2004 01 2004 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $12,125 $2,670 Not Implemented
UU0077 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,520 $5,000 Implemented
UU0077 # 03 Y:2004 03 2004 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $14,890 $45,000 Implemented
UU0077 # 04 Y:2004 04 2004 ADJUST PH FOR NEUTRALIZATION $12,850 $45,920 Not Implemented
MS0256 # 01 Y:2004 01 2004 INSTALL HYDROGEN FUEL CELL $711,668 $7,500,000 n/a
MS0256 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $53,846 $54,000 n/a
MS0256 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,367 $1,000 Implemented
MS0256 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,725 $3,794 Implemented
MS0256 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,059 $11,743 Not Implemented
MS0256 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,126 $422 Implemented
MA0567 # 01 Y:2004 01 2004 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $70,900 $270,000 Implemented
MA0567 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $61,633 $54,474 Not Implemented
MA0567 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,220 $11,950 Not Implemented
MA0567 # 04 Y:2004 04 2004 $8,762 $1,000 Implemented
MA0567 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $4,156 $6,867 Implemented
MA0567 # 06 Y:2004 06 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,942 $5,000 Not Implemented
MA0567 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $1,615 $1,369 Implemented
IC0091 # 01 Y:2004 01 2004 REPAIR OR REPLACE STEAM TRAPS $1,701 $638 Implemented
IC0091 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,038 $1,315 Implemented
IC0091 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,889 $1,265 Implemented
IC0091 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,000 $11,805 Not Implemented
IC0091 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $466 $1,428 Not Implemented
IC0091 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $748 $2,287 Not Implemented