IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0788 # 03 Y:2008 03 2008 OPTIMIZE PLANT POWER FACTOR $26,537 $21,250 Implemented
UD0788 # 04 Y:2008 04 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $20,385 $440 Implemented
UD0788 # 05 Y:2008 05 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $17,084 $0 Not Implemented
UD0788 # 06 Y:2008 06 2008 AIR CONDITION ONLY SPACE NECESSARY $13,860 $0 Implemented
UD0788 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $2,123 $3,500 Implemented
UD0788 # 08 Y:2008 08 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,134 $7,000 Not Implemented
UD0788 # 09 Y:2008 09 2008 UPGRADE CONTROLS ON COMPRESSORS $1,037 $200 Implemented
UD0788 # 10 Y:2008 10 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $590 $0 Implemented
UD0788 # 11 Y:2008 11 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $372 $0 Implemented
OK0769 # 01 Y:2008 01 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $53,558 $2,347 Not Implemented
OK0769 # 02 Y:2008 02 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $18,368 $731 Not Implemented
OK0769 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $788 $1,922 Implemented
OK0769 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $98,641 $246,228 Not Implemented
OK0769 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,911 $4,475 Implemented
OK0769 # 06 Y:2008 06 2008 $2,068 $200 Not Implemented
OK0769 # 07 Y:2008 07 2008 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $451,827 $2,500,000 Not Implemented
IC0148 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $261 $300 Implemented
IC0148 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $156 $102 Implemented
IC0148 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $1,624 $2,693 Implemented
IC0148 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $476 $1,278 Implemented
IC0148 # 05 Y:2008 05 2008 USE POWER DURING OFF-PEAK PERIODS $55 $0 Implemented
IC0148 # 06 Y:2008 06 2008 INSULATE BARE EQUIPMENT $1,124 $913 Implemented
IC0148 # 07 Y:2008 07 2008 BURN WASTE OIL FOR HEAT $4,155 $0 Implemented
IC0148 # 08 Y:2008 08 2008 TREAT AND REUSE RINSE WATERS $21,012 $27,696 Not Implemented
AM0554 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $213,800 $45,770 Implemented