IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0269 # 08 Y:2014 08 2014 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,668 $6,886 Implemented
MI0269 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,598 $2,160 Implemented
MI0269 # 10 Y:2014 10 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,064 $360 Implemented
MI0269 # 11 Y:2014 11 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $928 $1,660 Implemented
MI0269 # 12 Y:2014 12 2014 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $140 $20 Implemented
MI0269 # 13 Y:2014 13 2014 INSTALL OCCUPANCY SENSORS $51 $80 Implemented
MZ0159 # 01 Y:2014 01 2014 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $51,046 $118,500 Not Implemented
MZ0159 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $428 $1,200 Implemented
MZ0159 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $1,973 $1,599 Implemented
MZ0159 # 04 Y:2014 04 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $12,895 $37,500 Implemented
MZ0159 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,788 $23,000 Implemented
MZ0159 # 06 Y:2014 06 2014 USE PHOTOCELL CONTROLS $5,170 $1,000 Not Implemented
OK0901 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,026 $1,766 Not Implemented
OK0901 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,047 $1,378 Not Implemented
OK0901 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,102 $1,890 Not Implemented
OK0901 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,328 $24,267 Not Implemented
OK0901 # 05 Y:2014 05 2014 INSTALL TIMERS AND/OR THERMOSTATS $156 $606 Not Implemented
OK0901 # 06 Y:2014 06 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $40,018 $156,997 Not Implemented
OR0641 # 01 Y:2014 01 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $17,076 $2,794 Implemented
OR0641 # 02 Y:2014 02 2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $13,580 $8,760 Implemented
OR0641 # 03 Y:2014 03 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,509 $8,500 Not Implemented
OR0641 # 04 Y:2014 04 2014 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,470 $1,577 Implemented
OR0641 # 05 Y:2014 05 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $581 $1,121 Implemented
UD0914 # 05 Y:2014 05 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,264 $5,000 Not Implemented
UD0914 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,960 $5,000 Not Implemented