IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0231 # 05 Y:2020 05 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,416 $0 Implemented
TT0234 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $18,933 $450 Not Implemented
TT0234 # 02 Y:2020 02 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,187 $15,000 Not Implemented
TT0234 # 03 Y:2020 03 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,742 $3,800 Not Implemented
TT0234 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,207 $3,000 Not Implemented
TT0234 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,041 $3,675 Not Implemented
CL2002 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,753 $16,667 Implemented
CL2002 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $70,362 $136,200 Implemented
CL2002 # 03 Y:2020 03 2020 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $49,183 $300,000 Implemented
AM0795 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $3,600 $35 Implemented
AM0795 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,426 $1,000 Implemented
AM0795 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,710 $18 Not Implemented
AM0795 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $710 $284 Not Implemented
AM0795 # 05 Y:2020 05 2020 PAY UTILITY BILLS ON TIME $1,105 $0 Implemented
MI0367 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $38,331 $2,480 Implemented
MI0367 # 02 Y:2020 02 2020 USE BATTERY STORAGE FOR DEMAND CONTROL $21,335 $38,237 Not Implemented
MI0367 # 03 Y:2020 03 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $18,517 $2,480 Implemented
MI0367 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,815 $120 Implemented
MI0367 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,479 $9,842 Implemented
MI0367 # 06 Y:2020 06 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,241 $4,900 Not Implemented
MI0367 # 07 Y:2020 07 2020 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,190 $2,500 Not Implemented
MI0367 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,348 $1,980 Not Implemented
WM0152 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $12,116 $86,310 Not Implemented
WM0152 # 02 Y:2020 02 2020 USE SYNTHETIC LUBRICANT $11,295 $6,800 Implemented
WM0152 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,181 $8,340 Not Implemented