Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
675
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0139 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $929 | $200 | Implemented |
BS0139 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $944 | $2,630 | Implemented |
OR0732 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,378 | $0 | Implemented |
OR0723 # 01 Y:2019 | 01 | 2019 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $488,033 | $1,500,000 | Implemented |
OR0723 # 03 Y:2019 | 03 | 2019 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $5,360 | $1,789 | Implemented |
OR0720 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $31,433 | $68,000 | Implemented |
OR0720 # 03 Y:2019 | 03 | 2019 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,330 | $1,100 | Implemented |
OR0719 # 03 Y:2019 | 03 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,031 | $9,861 | Implemented |
OR0719 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,576 | $12,018 | Implemented |
OR0719 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $7,063 | $6,896 | Implemented |
OR0712 # 01 Y:2018 | 01 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $200,991 | $689,600 | Implemented |
OR0712 # 05 Y:2018 | 05 | 2018 | INSULATE BARE EQUIPMENT | $17,619 | $17,511 | Implemented |
OR0712 # 06 Y:2018 | 06 | 2018 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $6,403 | $30,000 | Implemented |
OR0691 # 02 Y:2017 | 02 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,762 | $1,200 | Implemented |
OR0691 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $955 | $1,955 | Implemented |
OR0690 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,285 | $2,321 | Implemented |
OR0688 # 02 Y:2017 | 02 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,221 | $180,000 | Implemented |
OR0688 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,431 | $448 | Implemented |
BS0098 # 01 Y:2017 | 01 | 2017 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $5,881 | $50,450 | Implemented |
BS0098 # 10 Y:2017 | 10 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,240 | $400 | Implemented |
BS0098 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $148 | $480 | Implemented |
BS0098 # 07 Y:2017 | 07 | 2017 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $48 | $15 | Implemented |
BS0098 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,453 | $132 | Implemented |
BS0098 # 03 Y:2017 | 03 | 2017 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $601 | $1,100 | Implemented |
BS0098 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $406 | $18 | Implemented |