Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1997 |
Principal Product | Fans and Shutters |
NAICS | n/a |
SIC | 3564 - Blowers And Fans |
Sales | $10,000,000-$50,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 225,000 |
Annual Production | 250,000 Pieces |
Production Hrs. Annual | 2,216 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $126,335 | 1,511,430 | kWh | $0.08 |
Electricity Demand | $31,455 | 8,212 | kW-months/year | $3.83 |
Natural Gas | $82,919 | 18,551 | MMBtu | $4.47 |
TOTAL ENERGY COSTS | $254,462 | |||
RECOMMENDED SAVINGS* | $300,482 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $96,285 |
#|Description |
Savings Cost |
Status | Electricity Usage | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $666 Cost: $304 |
$666 | 6,448 | - | - | - | - |
$666 6,448 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $3,632 Cost: $4,205 |
$3,632 | 34,877 | - | - | - | - |
$3,632 34,877 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $731 Cost: $240 |
$731 | 7,034 | - | - | - | - |
$731 7,034 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $734 Cost: $170 |
$734 | 7,913 | - | - | - | - |
$734 7,913 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $260 Cost: $596 |
$260 | 2,638 | - | - | - | - |
$260 2,638 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3136 OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS |
Savings: $256 Cost: - |
$256 | 2,931 | - | - | - | - |
$256 2,931 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1162 USE LESS WASTEFUL PACKAGING |
Savings: $210 Cost: $300 |
- | - | $210 | 2,900 | - | - |
- - kWh |
$210 2,900 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $18,493 Cost: $4,546 |
- | - | $18,493 | 64,515 | - | - |
- - kWh |
$18,493 64,515 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL |
Savings: $203,000 Cost: $350,000 |
- | - | - | - | $203,000 | - |
- - kWh |
- - lb |
$203,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $29,000 Cost: $6,500 |
- | - | - | - | $29,000 | - |
- - kWh |
- - lb |
$29,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL |
Savings: $43,500 Cost: $1,800 |
- | - | - | - | $43,500 | - |
- - kWh |
- - lb |
$43,500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $300,482 Cost: $368,661 |
$6,279 | 61,841 | $18,703 | 67,415 | $275,500 | - | $6,279 61,841 kWh |
$18,703 67,415 lb |
$275,500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $96,285 Cost: $18,121 |
$5,292 | 51,876 | $18,493 | 64,515 | $72,500 | - | $5,292 51,876 kWh |
$18,493 64,515 lb |
$72,500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Solid Waste (non-haz) | Personnel Changes |