IAC logo
IAC Assessment: AR0120
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0120
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1997
Principal Product Fans and Shutters
NAICS n/a
SIC 3564 - Blowers And Fans
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 225,000
Annual Production 250,000 Pieces
Production Hrs. Annual 2,216
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,335 1,511,430 kWh $0.08
Electricity Demand $31,455 8,212 kW-months/year $3.83
Natural Gas $82,919 18,551 MMBtu $4.47
TOTAL ENERGY COSTS $254,462
RECOMMENDED SAVINGS* $300,482 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $96,285
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Personnel Changes Electricity Usage Solid Waste (non-haz) Personnel Changes
$ kWh $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$666
Cost:
$304
$666 6,448 - - - - $666
6,448
kWh
-
-
lb
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,632
Cost:
$4,205
$3,632 34,877 - - - - $3,632
34,877
kWh
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$731
Cost:
$240
$731 7,034 - - - - $731
7,034
kWh
-
-
lb
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$734
Cost:
$170
$734 7,913 - - - - $734
7,913
kWh
-
-
lb
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$260
Cost:
$596
$260 2,638 - - - - $260
2,638
kWh
-
-
lb
-
-
$
06: 2.3136 OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS Savings:
$256
Cost:
-
$256 2,931 - - - - $256
2,931
kWh
-
-
lb
-
-
$
07: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$210
Cost:
$300
- - $210 2,900 - - -
-
kWh
$210
2,900
lb
-
-
$
08: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$18,493
Cost:
$4,546
- - $18,493 64,515 - - -
-
kWh
$18,493
64,515
lb
-
-
$
09: 4.1120 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$203,000
Cost:
$350,000
- - - - $203,000 - -
-
kWh
-
-
lb
$203,000
-
$
10: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$29,000
Cost:
$6,500
- - - - $29,000 - -
-
kWh
-
-
lb
$29,000
-
$
11: 4.1120 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$43,500
Cost:
$1,800
- - - - $43,500 - -
-
kWh
-
-
lb
$43,500
-
$
TOTAL RECOMMENDED Savings:
$300,482
Cost:
$368,661
$6,279 61,841 $18,703 67,415 $275,500 - $6,279
61,841
kWh
$18,703
67,415
lb
$275,500
-
$
TOTAL IMPLEMENTED Savings:
$96,285
Cost:
$18,121
$5,292 51,876 $18,493 64,515 $72,500 - $5,292
51,876
kWh
$18,493
64,515
lb
$72,500
-
$
Savings
Cost
$ kWh $ lb $ $
Electricity Usage Solid Waste (non-haz) Personnel Changes Electricity Usage Solid Waste (non-haz) Personnel Changes