IAC logo
IAC Assessment: AS0204
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0204
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1997
Principal Product Non-Metallic Honeycomb Material
NAICS n/a
SIC 2295 - Coated Fabrics, Not Rubberized
Sales $10,000,000-$50,000,000
# of Employees 47
Plant Area (Sq.Ft.) 154,000
Annual Production 1,000 Thousand Feet
Production Hrs. Annual 4,043
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $274,277 7,737,398 kWh $0.04
Electricity Demand $146,736 15,805 kW-months/year $9.28
Electricity Fees $85,512 - $ -
Natural Gas $281,866 95,813 MMBtu $2.94
TOTAL ENERGY COSTS $797,906
RECOMMENDED SAVINGS* $188,095 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Other Liquid (haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Other Liquid (haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ gal $ gal $ $ $ $
01: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$63,320
Cost:
$2,400
- - - - $63,320 21,327 - - - - - - - - -
-
kWh
-
-
kW-months/year
$63,320
21,327
MMBtu
-
-
gal
-
-
gal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,248
Cost:
$16,974
$4,062 121,630 $4,186 273 - - - - - - - - - - $4,062
121,630
kWh
$4,186
273
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$6,113
Cost:
$8,000
$2,399 74,150 $3,714 242 - - - - - - - - - - $2,399
74,150
kWh
$3,714
242
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,786
Cost:
$60
$1,179 35,463 $1,607 105 - - - - - - - - - - $1,179
35,463
kWh
$1,607
105
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,579
Cost:
-
$777 23,447 $802 52 - - - - - - - - - - $777
23,447
kWh
$802
52
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,288
Cost:
$3,115
$545 16,413 $743 48 - - - - - - - - - - $545
16,413
kWh
$743
48
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,188
Cost:
$1,381
$506 14,947 $682 45 - - - - - - - - - - $506
14,947
kWh
$682
45
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$696
Cost:
$1,650
$463 14,654 $233 15 - - - - - - - - - - $463
14,654
kWh
$233
15
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
-
-
$
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$324
Cost:
$320
$324 13,482 - - - - - - - - - - - - $324
13,482
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
-
-
$
10: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$36,527
Cost:
$13,260
$(-1,363) 56,858 - - - - $37,890 5,048 - - - - - - $(-1,363)
56,858
kWh
-
-
kW-months/year
-
-
MMBtu
$37,890
5,048
gal
-
-
gal
-
-
$
-
-
$
11: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$56,857
Cost:
$66,040
- - - - - - - - $27,191 3,640 $10,920 - $18,746 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$27,191
3,640
gal
$10,920
-
$
$18,746
-
$
12: 4.5210 CLEAR AND RENT EXISTING SPACE Savings:
$9,169
Cost:
$19,200
$3,442 104,924 $5,727 374 - - - - - - - - - - $3,442
104,924
kWh
$5,727
374
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$188,095
Cost:
$132,400
$12,334 475,968 $17,694 1,154 $63,320 21,327 $37,890 5,048 $27,191 3,640 $10,920 - $18,746 - $12,334
475,968
kWh
$17,694
1,154
kW-months/year
$63,320
21,327
MMBtu
$37,890
5,048
gal
$27,191
3,640
gal
$10,920
-
$
$18,746
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Other Liquid (haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Other Liquid (haz) Personnel Changes Primary Raw Material