IAC logo
IAC Assessment: BD0040
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0040
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1995
Principal Product Hourmeters, Heavy duty flashers, Pressure switches, Shifter
NAICS n/a
SIC 3694 - Engine Electrical Equipment
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 73,358
Annual Production 9,000,000 Pieces
Production Hrs. Annual 4,420
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $196,486 3,301,876 kWh $0.06
Natural Gas $15,932 3,939 MMBtu $4.04
TOTAL ENERGY COSTS $212,418
RECOMMENDED SAVINGS* $13,713 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,820
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$382
Cost:
$750
$382 6,448 - - $382
6,448
kWh
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,916
Cost:
$3,500
- - $3,916 967 -
-
kWh
$3,916
967
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,605
Cost:
$8,310
$3,605 60,668 - - $3,605
60,668
kWh
-
-
MMBtu
04: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$2,288
Cost:
$3,000
- - $2,288 565 -
-
kWh
$2,288
565
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,726
Cost:
$975
$2,726 45,721 - - $2,726
45,721
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$494
Cost:
$450
$494 8,206 - - $494
8,206
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$302
Cost:
$684
$302 4,982 - - $302
4,982
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$13,713
Cost:
$17,669
$7,509 126,025 $6,204 1,532 $7,509
126,025
kWh
$6,204
1,532
MMBtu
TOTAL IMPLEMENTED Savings:
$7,820
Cost:
$6,359
$3,904 65,357 $3,916 967 $3,904
65,357
kWh
$3,916
967
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas