IAC logo
IAC Assessment: BD0235
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0235
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2003
Principal Product Printed Circuit Boards
NAICS 334412 - Bare Printed Circuit Board Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 185
Plant Area (Sq.Ft.) 60,000
Annual Production 3,500,000 Pieces
Production Hrs. Annual 8,760
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $110,500 1,884,096 kWh $0.06
Electricity Demand $13,834 5,910 kW-months/year $2.34
Electricity Fees $156 - $ -
Natural Gas $6,643 1,388 MMBtu $4.79
TOTAL ENERGY COSTS $132,198
RECOMMENDED SAVINGS* $93,481 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $77,659
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,609
Cost:
$7,200
$10,685 259,983 $975 417 $(-7,051) (-1,474) - - - - - - - - $10,685
259,983
kWh
$975
417
kW-months/year
$(-7,051)
(-1,474)
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,778
Cost:
$5,025
$3,324 80,862 $454 194 - - - - - - - - - - $3,324
80,862
kWh
$454
194
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,478
Cost:
$3,000
- - - - $2,478 518 - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,478
518
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,330
Cost:
$5,700
$2,314 56,291 $100 42 - - - - - - $(-84) - - - $2,314
56,291
kWh
$100
42
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$(-84)
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$814
Cost:
$370
$470 11,405 $86 37 - - - - - - $173 - $85 - $470
11,405
kWh
$86
37
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$173
-
$
$85
-
$
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$267
Cost:
$600
- - - - $267 56 - - - - - - - - -
-
kWh
-
-
kW-months/year
$267
56
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$236
Cost:
$500
$219 5,328 $17 7 - - - - - - - - - - $219
5,328
kWh
$17
7
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$214
Cost:
$300
$198 4,823 $16 7 - - - - - - - - - - $198
4,823
kWh
$16
7
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,665
Cost:
$5,500
- - - - - - - - $2,665 394,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$2,665
394,000
lb
-
-
$
-
-
$
10: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$317
Cost:
$1,200
- - - - - - $317 158 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$317
158
gal
-
-
lb
-
-
$
-
-
$
11: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$73,846
Cost:
$7,500
- - - - - - - - - - $73,846 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$73,846
-
$
-
-
$
12: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,577
Cost:
$2,000
- - $1,577 744 - - - - - - - - - - -
-
kWh
$1,577
744
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
13: 4.213 PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING Savings:
$350
Cost:
$80
- - - - - - - - - - - - $350 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$350
-
$
TOTAL RECOMMENDED Savings:
$93,481
Cost:
$38,975
$17,210 418,692 $3,225 1,448 $(-4,306) (-900) $317 158 $2,665 394,000 $73,935 - $435 - $17,210
418,692
kWh
$3,225
1,448
kW-months/year
$(-4,306)
(-900)
MMBtu
$317
158
gal
$2,665
394,000
lb
$73,935
-
$
$435
-
$
TOTAL IMPLEMENTED Savings:
$77,659
Cost:
$15,180
$198 4,823 $16 7 $267 56 $317 158 $2,665 394,000 $73,846 - $350 - $198
4,823
kWh
$16
7
kW-months/year
$267
56
MMBtu
$317
158
gal
$2,665
394,000
lb
$73,846
-
$
$350
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost