IAC logo
IAC Assessment: HO0158
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0158
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1997
Principal Product Extruding plastics
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 50,000
Annual Production 1,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,187 1,497,069 kWh $0.06
Electricity Demand $97,692 4,320 kW-months/year $22.61
Electricity Fees $15,249 - $ -
Natural Gas $2,438 314 MMBtu $7.76
TOTAL ENERGY COSTS $208,966
RECOMMENDED SAVINGS* $23,465 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,948
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,562
Cost:
$13,794
$5,330 93,787 $4,232 187 - - - - - - $5,330
93,787
kWh
$4,232
187
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$655
Cost:
$1,350
$655 11,430 - - - - - - - - $655
11,430
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,827
Cost:
-
$5,243 92,028 $4,084 184 - - $(-4,500) - - - $5,243
92,028
kWh
$4,084
184
kW-months/year
-
-
lb
$(-4,500)
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$621
Cost:
$600
$351 6,155 $270 12 - - - - - - $351
6,155
kWh
$270
12
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$2,500
Cost:
$1,000
- - - - - - $2,500 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$2,500
-
$
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,300
Cost:
$6,500
- - - - $6,300 1,000 $(-3,000) - - - -
-
kWh
-
-
kW-months/year
$6,300
1,000
lb
$(-3,000)
-
$
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$2,000
Cost:
$2,000
- - - - - - $(-2,000) - $4,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$(-2,000)
-
$
$4,000
-
$
TOTAL RECOMMENDED Savings:
$23,465
Cost:
$25,244
$11,579 203,400 $8,586 383 $6,300 1,000 $(-7,000) - $4,000 - $11,579
203,400
kWh
$8,586
383
kW-months/year
$6,300
1,000
lb
$(-7,000)
-
$
$4,000
-
$
TOTAL IMPLEMENTED Savings:
$7,948
Cost:
$1,600
$5,594 98,183 $4,354 196 - - $(-2,000) - - - $5,594
98,183
kWh
$4,354
196
kW-months/year
-
-
lb
$(-2,000)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material