IAC Assessment: KG0070
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0070
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1996
Principal Product Concrete pipe and Pre-cast
NAICS n/a
SIC 3273 - Ready-mixed Concrete
Sales $50,000,000-$100,000,000
# of Employees 40
Plant Area (Sq.Ft.) 1,020,085
Annual Production 66,000 Tons
Production Hrs. Annual 3,125
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $161,544 1,572,098 kWh $0.10
Electricity Demand $54,944 8,655 kW-months/year $6.35
Electricity Fees $6,869 - $ -
Natural Gas $35,225 6,767 MMBtu $5.21
TOTAL ENERGY COSTS $286,772
RECOMMENDED SAVINGS* $36,333 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,916
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ lb
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,417
Cost:
-
- - - - $2,417 - - - -
-
kWh
-
-
kW-months/year
$2,417
-
$
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,060
Cost:
$4,750
$1,629 26,084 $431 67 - - - - $1,629
26,084
kWh
$431
67
kW-months/year
-
-
$
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,084
Cost:
$464
$726 11,723 $358 56 - - - - $726
11,723
kWh
$358
56
kW-months/year
-
-
$
-
-
lb
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,582
Cost:
$600
$2,582 41,325 - - - - - - $2,582
41,325
kWh
-
-
kW-months/year
-
-
$
-
-
lb
05: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$3,326
Cost:
$500
- - - - - - $3,326 1,300 -
-
kWh
-
-
kW-months/year
-
-
$
$3,326
1,300
lb
06: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$24,864
Cost:
$5,000
- - - - - - $24,864 432,000 -
-
kWh
-
-
kW-months/year
-
-
$
$24,864
432,000
lb
TOTAL RECOMMENDED Savings:
$36,333
Cost:
$11,314
$4,937 79,132 $789 123 $2,417 - $28,190 433,300 $4,937
79,132
kWh
$789
123
kW-months/year
$2,417
-
$
$28,190
433,300
lb
TOTAL IMPLEMENTED Savings:
$33,916
Cost:
$11,314
$4,937 79,132 $789 123 - - $28,190 433,300 $4,937
79,132
kWh
$789
123
kW-months/year
-
-
$
$28,190
433,300
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz)