Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Loyola Marymount University |
---|---|
Assessment Year | 2003 |
Principal Product | Fireplace Units |
NAICS | 333414 - Heating Equipment (except Warm Air Furnaces) Manufacturing |
SIC | 3433 - Heating Equipment, Except Electric |
Sales | $10,000,000-$50,000,000 |
# of Employees | 220 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 30,000 Pieces |
Production Hrs. Annual | 4,400 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $384,269 | 3,249,469 | kWh | $0.12 |
Electricity Demand | $103,113 | 8,760 | kW-months/year | $11.77 |
Electricity Fees | $55,817 | - | $ | - |
Natural Gas | $70,469 | 13,330 | MMBtu | $5.29 |
TOTAL ENERGY COSTS | $613,668 | |||
RECOMMENDED SAVINGS* | $718,319 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $714,483 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,003 Cost: $6,290 |
$2,280 | 17,908 | $723 | 49 | - | - | - | - | - | - | - | - |
$2,280 17,908 kWh |
$723 49 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $5,246 Cost: - |
$4,182 | 28,194 | $1,064 | 77 | - | - | - | - | - | - | - | - |
$4,182 28,194 kWh |
$1,064 77 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $711 Cost: $724 |
$540 | 4,245 | $171 | 12 | - | - | - | - | - | - | - | - |
$540 4,245 kWh |
$171 12 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $415 Cost: $219 |
$315 | 2,473 | $100 | 7 | - | - | - | - | - | - | - | - |
$315 2,473 kWh |
$100 7 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,369 Cost: $410 |
$5,987 | 47,036 | $1,902 | 128 | - | - | $(-520) | - | - | - | - | - |
$5,987 47,036 kWh |
$1,902 128 kW-months/year |
- - MMBtu |
$(-520) - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER |
Savings: $3,170 Cost: $1,950 |
$2,406 | 18,900 | $764 | 52 | - | - | - | - | - | - | - | - |
$2,406 18,900 kWh |
$764 52 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $666 Cost: $750 |
- | - | - | - | $666 | 125 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$666 125 MMBtu |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $17,255 Cost: - |
$10,948 | 55,601 | $6,307 | 436 | - | - | - | - | - | - | - | - |
$10,948 55,601 kWh |
$6,307 436 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $52,500 Cost: $19,910 |
- | - | - | - | - | - | - | - | - | - | $52,500 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
$52,500 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $105,000 Cost: $17,500 |
- | - | - | - | - | - | - | - | - | - | $105,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
$105,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $17,820 Cost: $3,000 |
- | - | - | - | - | - | $(-82,800) | - | - | - | $100,620 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$(-82,800) - $ |
- - $ |
$100,620 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $505,164 Cost: - |
- | - | - | - | - | - | - | - | $505,164 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$505,164 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $718,319 Cost: $50,753 |
$26,658 | 174,357 | $11,031 | 761 | $666 | 125 | $(-83,320) | - | $505,164 | - | $258,120 | - | $26,658 174,357 kWh |
$11,031 761 kW-months/year |
$666 125 MMBtu |
$(-83,320) - $ |
$505,164 - $ |
$258,120 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $714,483 Cost: $48,053 |
$24,252 | 155,457 | $10,267 | 709 | - | - | $(-83,320) | - | $505,164 | - | $258,120 | - | $24,252 155,457 kWh |
$10,267 709 kW-months/year |
- - MMBtu |
$(-83,320) - $ |
$505,164 - $ |
$258,120 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Increase in Production |