IAC logo
IAC Assessment: NC0096
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0096
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1996
Principal Product Wood veneer
NAICS n/a
SIC 2435 - Hardwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 75,000
Annual Production 30,000 Thousand Feet
Production Hrs. Annual 2,750
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,605 1,654,162 kWh $0.04
Electricity Demand $48,048 5,736 kW-months/year $8.38
Electricity Fees $4,456 - $ -
Natural Gas $56,288 15,341 MMBtu $3.67
TOTAL ENERGY COSTS $178,297
RECOMMENDED SAVINGS* $73,161 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $72,940
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$778
Cost:
$1,676
$360 10,844 $418 50 - - - - - - - - $360
10,844
kWh
$418
50
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,187
Cost:
$5,250
$563 16,706 $624 73 - - - - - - - - $563
16,706
kWh
$624
73
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$301
Cost:
$352
$143 4,396 $158 19 - - - - - - - - $143
4,396
kWh
$158
19
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$221
Cost:
$22
$105 3,224 $116 14 - - - - - - - - $105
3,224
kWh
$116
14
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$869
Cost:
$2,312
- - - - $869 355 - - - - - - -
-
kWh
-
-
kW-months/year
$869
355
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
06: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$60,860
Cost:
$15,000
$34 879 $26 3 $30,800 8,400 - - - - $30,000 - $34
879
kWh
$26
3
kW-months/year
$30,800
8,400
MMBtu
-
-
MMBtu
-
-
lb
$30,000
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,045
Cost:
$140,000
- - - - - - $(-955) (-96) $6,000 400,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$(-955)
(-96)
MMBtu
$6,000
400,000
lb
-
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$3,900
Cost:
$100
- - - - - - - - $3,900 260,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$3,900
260,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$73,161
Cost:
$164,712
$1,205 36,049 $1,342 159 $31,669 8,755 $(-955) (-96) $9,900 660,000 $30,000 - $1,205
36,049
kWh
$1,342
159
kW-months/year
$31,669
8,755
MMBtu
$(-955)
(-96)
MMBtu
$9,900
660,000
lb
$30,000
-
$
TOTAL IMPLEMENTED Savings:
$72,940
Cost:
$164,690
$1,100 32,825 $1,226 145 $31,669 8,755 $(-955) (-96) $9,900 660,000 $30,000 - $1,100
32,825
kWh
$1,226
145
kW-months/year
$31,669
8,755
MMBtu
$(-955)
(-96)
MMBtu
$9,900
660,000
lb
$30,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Solid Waste (non-haz) Personnel Changes