IAC Assessment: NC0473
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0473
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2012
Principal Product Tobacco
NAICS 312230 - Tobacco Manufacturing
SIC 2141 - Tobacco Stemming And Redrying
Sales $100,000,000-$500,000,000
# of Employees 900
Plant Area (Sq.Ft.) 650,000
Annual Production 100,000,000 Pounds
Production Hrs. Annual 6,500
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,521,647 26,371,696 kWh $0.06
Electricity Demand $895,899 64,037 kW-months/year $13.99
Electricity Fees $(-15,797) - $ -
Coal $932,980 159,959 MMBtu $5.83
TOTAL ENERGY COSTS $3,334,729
RECOMMENDED SAVINGS* $378,819 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $191,102
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Coal Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Coal Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$58,630
Cost:
$62,137
$31,751 550,277 $21,334 1,016 - - - - - - $5,545 - $31,751
550,277
kWh
$21,334
1,016
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$5,545
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,071
Cost:
$40,919
$7,220 125,132 $4,851 230 - - - - - - - - $7,220
125,132
kWh
$4,851
230
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$582
Cost:
$562
$195 3,380 $97 5 - - - - - - $290 - $195
3,380
kWh
$97
5
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$290
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$6,691
Cost:
$3,000
$3,264 56,576 $3,427 486 - - - - - - - - $3,264
56,576
kWh
$3,427
486
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,417
Cost:
$200
$4,699 81,445 $3,158 150 - - - - $(-1,200) - $(-240) - $4,699
81,445
kWh
$3,158
150
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-1,200)
-
$
$(-240)
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$51,369
Cost:
$125,000
- - - - $51,369 8,811 - - - - - - -
-
kWh
-
-
kW-months/year
$51,369
8,811
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$186,985
Cost:
$44,020
- - - - $186,985 32,000 - - - - - - -
-
kWh
-
-
kW-months/year
$186,985
32,000
MMBtu
-
-
Tgal
-
-
$
-
-
$
08: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$732
Cost:
-
- - - - $482 83 $250 22,462 - - - - -
-
kWh
-
-
kW-months/year
$482
83
MMBtu
$250
22,462
Tgal
-
-
$
-
-
$
09: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$27,364
Cost:
$16,000
- - - - $10,739 1,842 $16,625 1,496,400 - - - - -
-
kWh
-
-
kW-months/year
$10,739
1,842
MMBtu
$16,625
1,496,400
Tgal
-
-
$
-
-
$
10: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$27,978
Cost:
$9,000
- - - - $27,978 4,799 - - - - - - -
-
kWh
-
-
kW-months/year
$27,978
4,799
MMBtu
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$378,819
Cost:
$300,838
$47,129 816,810 $32,867 1,887 $277,553 47,535 $16,875 1,518,862 $(-1,200) - $5,595 - $47,129
816,810
kWh
$32,867
1,887
kW-months/year
$277,553
47,535
MMBtu
$16,875
1,518,862
Tgal
$(-1,200)
-
$
$5,595
-
$
TOTAL IMPLEMENTED Savings:
$191,102
Cost:
$256,818
$47,129 816,810 $32,867 1,887 $90,086 15,452 $16,625 1,496,400 $(-1,200) - $5,595 - $47,129
816,810
kWh
$32,867
1,887
kW-months/year
$90,086
15,452
MMBtu
$16,625
1,496,400
Tgal
$(-1,200)
-
$
$5,595
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Coal Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Coal Water Disposal Personnel Changes Ancillary Material Cost