Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2005 |
Principal Product | Frozen Pies |
NAICS | 311813 - Frozen Cakes, Pies, and Other Pastries Manufacturing |
SIC | 2053 - Frozen Bakery Products, Except Bread |
Sales | $100,000,000-$500,000,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 565,000 |
Annual Production | 210,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,034,297 | 35,361,705 | kWh | $0.03 |
Electricity Demand | $818,553 | 84,817 | kW-months/year | $9.65 |
Electricity Fees | $2,516 | - | $ | - |
Natural Gas | $183,613 | 24,652 | MMBtu | $7.45 |
TOTAL ENERGY COSTS | $2,330,467 | |||
RECOMMENDED SAVINGS* | $512,667 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $78,457 Cost: $36,299 |
- | - | - | - | $78,457 | 10,534 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$78,457 10,534 MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $77,748 Cost: $3,000 |
- | - | $77,748 | 8,057 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$77,748 8,057 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,054 Cost: $6,238 |
$6,054 | 207,335 | - | - | - | - | - | - | - | - | - | - | - | - |
$6,054 207,335 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL |
Savings: $293,585 Cost: $1,110,000 |
$47,961 | 1,642,500 | $21,587 | 2,244 | $78,293 | 10,512 | $145,744 | 2,570,880 | - | - | - | - | - | - |
$47,961 1,642,500 kWh |
$21,587 2,244 kW-months/year |
$78,293 10,512 MMBtu |
$145,744 2,570,880 lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $29,149 Cost: $3,000 |
- | - | - | - | - | - | - | - | - | - | $29,149 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$29,149 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $9,498 Cost: $21,600 |
$6,538 | 223,920 | $2,960 | 307 | - | - | - | - | - | - | - | - | - | - |
$6,538 223,920 kWh |
$2,960 307 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $7,492 Cost: $15,000 |
$7,492 | 256,580 | - | - | - | - | - | - | - | - | - | - | - | - |
$7,492 256,580 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $5,958 Cost: $2,709 |
- | - | - | - | $5,958 | 800 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,958 800 MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $942 Cost: $2,046 |
- | - | - | - | $942 | 126 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$942 126 MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $1,529 Cost: $1,150 |
- | - | - | - | $1,529 | 205 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,529 205 MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,733 Cost: $1,499 |
$194 | 6,658 | $88 | 9 | - | - | - | - | $448 | - | - | - | $1,003 | - |
$194 6,658 kWh |
$88 9 kW-months/year |
- - MMBtu |
- - lb |
$448 - $ |
- - $ |
$1,003 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $317 Cost: $156 |
$205 | 7,008 | $93 | 10 | - | - | - | - | $85 | - | - | - | $(-66) | - |
$205 7,008 kWh |
$93 10 kW-months/year |
- - MMBtu |
- - lb |
$85 - $ |
- - $ |
$(-66) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $205 Cost: $579 |
$205 | 7,030 | - | - | - | - | - | - | - | - | - | - | - | - |
$205 7,030 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $512,667 Cost: $1,203,276 |
$68,649 | 2,351,031 | $102,476 | 10,627 | $165,179 | 22,177 | $145,744 | 2,570,880 | $533 | - | $29,149 | - | $937 | - | $68,649 2,351,031 kWh |
$102,476 10,627 kW-months/year |
$165,179 22,177 MMBtu |
$145,744 2,570,880 lb |
$533 - $ |
$29,149 - $ |
$937 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost |