IAC Assessment: OK0700
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2005
Principal Product Frozen Pies
NAICS 311813 - Frozen Cakes, Pies, and Other Pastries Manufacturing
SIC 2053 - Frozen Bakery Products, Except Bread
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 565,000
Annual Production 210,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,034,297 35,361,705 kWh $0.03
Electricity Demand $818,553 84,817 kW-months/year $9.65
Electricity Fees $2,516 - $ -
Natural Gas $183,613 24,652 MMBtu $7.45
TOTAL ENERGY COSTS $2,330,467
RECOMMENDED SAVINGS* $512,667 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$78,457
Cost:
$36,299
- - - - $78,457 10,534 - - - - - - - - -
-
kWh
-
-
kW-months/year
$78,457
10,534
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$77,748
Cost:
$3,000
- - $77,748 8,057 - - - - - - - - - - -
-
kWh
$77,748
8,057
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,054
Cost:
$6,238
$6,054 207,335 - - - - - - - - - - - - $6,054
207,335
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$293,585
Cost:
$1,110,000
$47,961 1,642,500 $21,587 2,244 $78,293 10,512 $145,744 2,570,880 - - - - - - $47,961
1,642,500
kWh
$21,587
2,244
kW-months/year
$78,293
10,512
MMBtu
$145,744
2,570,880
lb
-
-
$
-
-
$
-
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$29,149
Cost:
$3,000
- - - - - - - - - - $29,149 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$29,149
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,498
Cost:
$21,600
$6,538 223,920 $2,960 307 - - - - - - - - - - $6,538
223,920
kWh
$2,960
307
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,492
Cost:
$15,000
$7,492 256,580 - - - - - - - - - - - - $7,492
256,580
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,958
Cost:
$2,709
- - - - $5,958 800 - - - - - - - - -
-
kWh
-
-
kW-months/year
$5,958
800
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$942
Cost:
$2,046
- - - - $942 126 - - - - - - - - -
-
kWh
-
-
kW-months/year
$942
126
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
10: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,529
Cost:
$1,150
- - - - $1,529 205 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,529
205
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,733
Cost:
$1,499
$194 6,658 $88 9 - - - - $448 - - - $1,003 - $194
6,658
kWh
$88
9
kW-months/year
-
-
MMBtu
-
-
lb
$448
-
$
-
-
$
$1,003
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$317
Cost:
$156
$205 7,008 $93 10 - - - - $85 - - - $(-66) - $205
7,008
kWh
$93
10
kW-months/year
-
-
MMBtu
-
-
lb
$85
-
$
-
-
$
$(-66)
-
$
13: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$205
Cost:
$579
$205 7,030 - - - - - - - - - - - - $205
7,030
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$512,667
Cost:
$1,203,276
$68,649 2,351,031 $102,476 10,627 $165,179 22,177 $145,744 2,570,880 $533 - $29,149 - $937 - $68,649
2,351,031
kWh
$102,476
10,627
kW-months/year
$165,179
22,177
MMBtu
$145,744
2,570,880
lb
$533
-
$
$29,149
-
$
$937
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost