IAC logo
IAC Assessment: SD0045
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0045
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1993
Principal Product FROZEN CITR,FRUIT JUICES
NAICS n/a
SIC 2033 - Canned Fruits And Vegetables
Sales $50,000,000-$100,000,000
# of Employees 260
Plant Area (Sq.Ft.) 0
Annual Production 18,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,388,209 16,457,210 kWh $0.08
Natural Gas $168,346 49,877 MMBtu $3.38
TOTAL ENERGY COSTS $1,556,555
RECOMMENDED SAVINGS* $94,087 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $94,087
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,714
Cost:
$6,185
$6,714 79,719 - - - - $6,714
79,719
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$14,975
Cost:
$19,672
$14,975 177,608 - - - - $14,975
177,608
kWh
-
-
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$13,104
Cost:
$80
$13,104 155,334 - - - - $13,104
155,334
kWh
-
-
MMBtu
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$846
Cost:
$1,200
$846 14,361 - - - - $846
14,361
kWh
-
-
MMBtu
-
-
$
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$14,356
Cost:
$3,980
- - $14,356 4,260 - - -
-
kWh
$14,356
4,260
MMBtu
-
-
$
06: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$4,682
Cost:
$750
- - $4,682 1,389 - - -
-
kWh
$4,682
1,389
MMBtu
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$16,668
Cost:
-
$16,668 - - - - - $16,668
-
kWh
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,464
Cost:
-
$10,093 119,578 - - $(-629) - $10,093
119,578
kWh
-
-
MMBtu
$(-629)
-
$
09: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$8,119
Cost:
$7,640
$7,041 83,236 - - $1,078 - $7,041
83,236
kWh
-
-
MMBtu
$1,078
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,643
Cost:
-
$2,567 30,481 - - $1,076 - $2,567
30,481
kWh
-
-
MMBtu
$1,076
-
$
11: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,516
Cost:
$600
$1,516 17,878 - - - - $1,516
17,878
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$94,087
Cost:
$40,107
$73,524 678,195 $19,038 5,649 $1,525 - $73,524
678,195
kWh
$19,038
5,649
MMBtu
$1,525
-
$
TOTAL IMPLEMENTED Savings:
$94,087
Cost:
$40,107
$73,524 678,195 $19,038 5,649 $1,525 - $73,524
678,195
kWh
$19,038
5,649
MMBtu
$1,525
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes