Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1993 |
Principal Product | OPTICAL LENSES (PLASTIC) |
NAICS | n/a |
SIC | 3827 - Optical Instruments And Lenses |
Sales | $10,000,000-$50,000,000 |
# of Employees | 500 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 23,400,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $673,436 | 9,575,029 | kWh | $0.07 |
Natural Gas | $66,055 | 23,598 | MMBtu | $2.80 |
TOTAL ENERGY COSTS | $739,491 | |||
RECOMMENDED SAVINGS* | $146,893 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $54,047 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,160 Cost: $1,207 |
$1,160 | 16,413 | - | - | - | - |
$1,160 16,413 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,446 Cost: $3,100 |
$2,446 | 34,877 | - | - | - | - |
$2,446 34,877 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $47,171 Cost: $20,975 |
$56,820 | 808,030 | $(-9,649) | (-3,446) | - | - |
$56,820 808,030 kWh |
$(-9,649) (-3,446) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $11,510 Cost: - |
$11,510 | - | - | - | - | - |
$11,510 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2191 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM |
Savings: $16,800 Cost: $11,500 |
- | - | $16,800 | 6,000 | - | - |
- - kWh |
$16,800 6,000 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $12,600 Cost: $5,400 |
- | - | $12,600 | 4,500 | - | - |
- - kWh |
$12,600 4,500 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $1,945 Cost: $3,500 |
- | - | $1,945 | 695 | - | - |
- - kWh |
$1,945 695 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $1,378 Cost: $398 |
- | - | $1,378 | 492 | - | - |
- - kWh |
$1,378 492 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $332 Cost: - |
- | - | $332 | 119 | - | - |
- - kWh |
$332 119 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $144 Cost: $76 |
- | - | $144 | 52 | - | - |
- - kWh |
$144 52 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2514 COVER OPEN TANKS |
Savings: $299 Cost: $417 |
$299 | 4,396 | - | - | - | - |
$299 4,396 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,628 Cost: $160 |
$2,628 | 37,222 | - | - | - | - |
$2,628 37,222 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,259 Cost: $40 |
$1,259 | 17,878 | - | - | - | - |
$1,259 17,878 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,880 Cost: $473 |
$2,536 | 36,049 | - | - | $3,344 | - |
$2,536 36,049 kWh |
- - MMBtu |
$3,344 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $2,448 Cost: $9,280 |
$2,448 | 26,671 | - | - | - | - |
$2,448 26,671 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,403 Cost: $455 |
$871 | 4,689 | - | - | $532 | - |
$871 4,689 kWh |
- - MMBtu |
$532 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE |
Savings: $34,305 Cost: - |
$34,305 | 487,984 | - | - | - | - |
$34,305 487,984 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $3,185 Cost: $300 |
$2,593 | 36,928 | $592 | 212 | - | - |
$2,593 36,928 kWh |
$592 212 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $146,893 Cost: $57,281 |
$118,875 | 1,511,137 | $24,142 | 8,624 | $3,876 | - | $118,875 1,511,137 kWh |
$24,142 8,624 MMBtu |
$3,876 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $54,047 Cost: $1,707 |
$53,455 | 596,425 | $592 | 212 | - | - | $53,455 596,425 kWh |
$592 212 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |