IAC logo
IAC Assessment: SD0072
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0072
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1994
Principal Product Animal Feeds
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 304,920
Annual Production 300 Pieces
Production Hrs. Annual 4,590
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,719 814,185 kWh $0.14
Natural Gas $39,527 6,352 MMBtu $6.22
TOTAL ENERGY COSTS $151,246
RECOMMENDED SAVINGS* $33,440 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,861
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,016
Cost:
$13,590
$7,016 53,634 - - $7,016
53,634
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$912
Cost:
$60
$912 7,034 - - $912
7,034
kWh
-
-
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$320
Cost:
$95
- - $320 52 -
-
kWh
$320
52
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,579
Cost:
$3,227
$6,579 15,826 - - $6,579
15,826
kWh
-
-
MMBtu
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,623
Cost:
$225
- - $1,623 261 -
-
kWh
$1,623
261
MMBtu
06: 2.2123 INSULATE FEEDWATER TANK Savings:
$243
Cost:
$309
- - $243 39 -
-
kWh
$243
39
MMBtu
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,238
Cost:
$300
$881 6,741 $357 58 $881
6,741
kWh
$357
58
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,515
Cost:
$2,413
$1,515 11,137 - - $1,515
11,137
kWh
-
-
MMBtu
09: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,104
Cost:
$2,070
$2,104 14,947 - - $2,104
14,947
kWh
-
-
MMBtu
10: 2.7134 USE PHOTOCELL CONTROLS Savings:
$619
Cost:
$115
$619 4,396 - - $619
4,396
kWh
-
-
MMBtu
11: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,245
Cost:
$760
$1,245 9,086 - - $1,245
9,086
kWh
-
-
MMBtu
12: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$10,026
Cost:
-
$10,026 - - - $10,026
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$33,440
Cost:
$23,164
$30,897 122,801 $2,543 410 $30,897
122,801
kWh
$2,543
410
MMBtu
TOTAL IMPLEMENTED Savings:
$26,861
Cost:
$19,937
$24,318 106,975 $2,543 410 $24,318
106,975
kWh
$2,543
410
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas