IAC logo
IAC Assessment: SF0126
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0126
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1997
Principal Product Pre-Engineered Metal Building Systems
NAICS n/a
SIC 3448 - Prefabricated Metal Buildings
Sales $10,000,000-$50,000,000
# of Employees 134
Plant Area (Sq.Ft.) 108,000
Annual Production 24,000 Tons
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $182,865 2,243,845 kWh $0.08
Electricity Demand $27,206 6,918 kW-months/year $3.93
Natural Gas $16,156 3,163 MMBtu $5.11
LPG $17,058 1,742 MMBtu $9.79
TOTAL ENERGY COSTS $267,485
RECOMMENDED SAVINGS* $72,525 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,935
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,912
Cost:
$15,660
$7,673 94,080 $1,239 315 - - - - $7,673
94,080
kWh
$1,239
315
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$4,008
Cost:
$4,000
$3,509 43,083 $499 127 - - - - $3,509
43,083
kWh
$499
127
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$904
Cost:
$1,271
$772 9,379 $132 34 - - - - $772
9,379
kWh
$132
34
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,248
Cost:
$4,065
$4,426 54,220 $822 209 - - - - $4,426
54,220
kWh
$822
209
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,606
Cost:
$1,880
$1,506 18,464 $100 25 - - - - $1,506
18,464
kWh
$100
25
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$6,415
Cost:
$2,079
- - - - $6,415 - - - -
-
kWh
-
-
kW-months/year
$6,415
-
MMBtu
-
-
lb
07: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$3,636
Cost:
$12,250
$3,210 39,273 $426 108 - - - - $3,210
39,273
kWh
$426
108
kW-months/year
-
-
MMBtu
-
-
lb
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$10,416
Cost:
$250
- - - - - - $10,416 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,416
-
lb
09: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$979
Cost:
$350
- - - - - - $979 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$979
-
lb
10: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$952
Cost:
-
- - - - - - $952 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$952
-
lb
11: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,394
Cost:
-
- - - - - - $1,394 2,526 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,394
2,526
lb
12: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$28,055
Cost:
$100,000
- - - - - - $28,055 5,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$28,055
5,000
lb
TOTAL RECOMMENDED Savings:
$72,525
Cost:
$141,805
$21,096 258,499 $3,218 818 $6,415 - $41,796 7,526 $21,096
258,499
kWh
$3,218
818
kW-months/year
$6,415
-
MMBtu
$41,796
7,526
lb
TOTAL IMPLEMENTED Savings:
$26,935
Cost:
$9,545
$6,704 82,063 $1,054 268 $6,415 - $12,762 2,526 $6,704
82,063
kWh
$1,054
268
kW-months/year
$6,415
-
MMBtu
$12,762
2,526
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)