IAC logo
IAC Assessment: ST0079
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ST0079
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Stevens Institute of Technology
Assessment Year 1986
Principal Product EMBROIDERED EMBLEMS
NAICS n/a
SIC 2399 - Fabricated Textile Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 40,000,000 Pieces
Production Hrs. Annual 4,375
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,285 1,167,057 kWh $0.09
Natural Gas $14,628 1,887 MMBtu $7.75
TOTAL ENERGY COSTS $119,913
RECOMMENDED SAVINGS* $21,673 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,354
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,257
Cost:
$6,000
$2,257 - - - $2,257
-
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,295
Cost:
$2,833
$1,295 14,361 - - $1,295
14,361
kWh
-
-
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$106
Cost:
$46
$106 1,172 - - $106
1,172
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$502
Cost:
$110
$502 5,569 - - $502
5,569
kWh
-
-
MMBtu
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$8,933
Cost:
$15,000
$8,933 99,062 - - $8,933
99,062
kWh
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,982
Cost:
-
$1,982 21,981 - - $1,982
21,981
kWh
-
-
MMBtu
07: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$1,956
Cost:
-
$1,956 21,688 - - $1,956
21,688
kWh
-
-
MMBtu
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,642
Cost:
$300
- - $4,642 599 -
-
kWh
$4,642
599
MMBtu
TOTAL RECOMMENDED Savings:
$21,673
Cost:
$24,289
$17,031 163,833 $4,642 599 $17,031
163,833
kWh
$4,642
599
MMBtu
TOTAL IMPLEMENTED Savings:
$17,354
Cost:
$18,243
$12,712 140,973 $4,642 599 $12,712
140,973
kWh
$4,642
599
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas