IAC Assessment: UD0140
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0140
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1984
Principal Product MARGARINE, SHORTENING
NAICS n/a
SIC 2079 - Edible Fats And Oils, Nec
Sales $10,000,000-$50,000,000
# of Employees 168
Plant Area (Sq.Ft.) 0
Annual Production 90,000,000 Pounds
Production Hrs. Annual 2,600
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $286,024 5,002,638 kWh $0.06
Natural Gas $279,115 48,317 MMBtu $5.78
TOTAL ENERGY COSTS $565,139
RECOMMENDED SAVINGS* $78,274 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,545
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$947
Cost:
$1,280
$947 14,947 - - $947
14,947
kWh
-
-
MMBtu
02: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$2,075
Cost:
$1,240
$858 30,481 $1,217 212 $858
30,481
kWh
$1,217
212
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,348
Cost:
$708
$2,705 27,550 $(-357) (-62) $2,705
27,550
kWh
$(-357)
(-62)
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$21,331
Cost:
$10,185
$2,870 50,117 $18,461 3,217 $2,870
50,117
kWh
$18,461
3,217
MMBtu
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$3,213
Cost:
$3,000
- - $3,213 560 -
-
kWh
$3,213
560
MMBtu
06: 2.1224 REPLACE BOILER Savings:
$40,533
Cost:
$25,000
- - $40,533 7,064 -
-
kWh
$40,533
7,064
MMBtu
07: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$1,755
Cost:
-
$1,755 30,188 - - $1,755
30,188
kWh
-
-
MMBtu
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$983
Cost:
$1,500
- - $983 171 -
-
kWh
$983
171
MMBtu
09: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,089
Cost:
$3,000
$5,089 - - - $5,089
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$78,274
Cost:
$45,913
$14,224 153,283 $64,050 11,162 $14,224
153,283
kWh
$64,050
11,162
MMBtu
TOTAL IMPLEMENTED Savings:
$33,545
Cost:
$16,413
$14,224 153,283 $19,321 3,367 $14,224
153,283
kWh
$19,321
3,367
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas