IAC Assessment: WI0051
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0051
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1989
Principal Product FASTENERS
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 195
Plant Area (Sq.Ft.) 0
Annual Production 10,800,000 Pounds
Production Hrs. Annual 4,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $404,587 6,677,315 kWh $0.06
Natural Gas $151,934 149,396 MMBtu $1.02
TOTAL ENERGY COSTS $556,521
RECOMMENDED SAVINGS* $146,721 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,707
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$9,567
Cost:
-
$9,567 157,972 - - $9,567
157,972
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,458
Cost:
-
$2,458 40,445 - - $2,458
40,445
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,788
Cost:
$5,246
$2,788 46,014 - - $2,788
46,014
kWh
-
-
MMBtu
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$12,672
Cost:
$5,000
$12,672 - - - $12,672
-
kWh
-
-
MMBtu
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$13,401
Cost:
-
$13,401 335,873 - - $13,401
335,873
kWh
-
-
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$100,358
Cost:
$40,000
$101,820 1,680,246 $(-1,462) (-1,433) $101,820
1,680,246
kWh
$(-1,462)
(-1,433)
MMBtu
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,417
Cost:
$5,000
- - $2,417 2,369 -
-
kWh
$2,417
2,369
MMBtu
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,060
Cost:
$14,250
- - $3,060 3,000 -
-
kWh
$3,060
3,000
MMBtu
TOTAL RECOMMENDED Savings:
$146,721
Cost:
$69,496
$142,706 2,260,550 $4,015 3,936 $142,706
2,260,550
kWh
$4,015
3,936
MMBtu
TOTAL IMPLEMENTED Savings:
$21,707
Cost:
$19,496
$18,647 422,332 $3,060 3,000 $18,647
422,332
kWh
$3,060
3,000
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas